Similar Projects
Oak Street Reservoir
Infrastructure
Bidding
Bingen, WA 98605

Oil Water Separators Maintenance Contract
Infrastructure
Post-Bid
Tacoma, WA 98433

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Actuator Replacement Project Fabrication
Alteration
Post-Bid
Richland, WA

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Above Ground Storage Tank Internal Inspection
Term Contract
Post-Bid
Yakima, WA 98901

Hanford Integrated Tank Disposition Contract
Alteration
Post-Bid
WA

Underground Storage Tank Cleaning Inspection and Lining Work Order 2022-2023
Infrastructure
Post-Bid
WA

Installation of a Tank and Fire Pump to Build
Infrastructure
Bidding
Pasco, WA

Last Updated 02/16/2022 07:08 AM
Project Title

Terry Cargil Reservoir

Physical Address View project details and contacts
City, State (County) Lacey, WA   (Thurston County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,900,000 to $12,050,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the installation of a new 1.25 million gallon composite elevated water storage tank and associated site utility and stormwater improvements, which includes a new 16-in diameter water main from the proposed tank to the existing water main on Intelco Loop SE, south of the tank site, new telemetry/SCADA controls for the tank, and onsite detention pond. Work to include meters, valves, connects to existing water system, catch basins, pavement, and lawn restoration, and onsite stormwater improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents