Similar Projects
New Water Treatment Plant
New Construction
Design
$74,000,000 est. value
Braintree, Holbrook, Randolph, MA

Clarifier Rehab
Renovation
Bidding
$140,700,000 est. value
Winthrop, MA

Deer Island Treatment Plant Clarifier Rehabilitation, Phase II - Filed Sub Bids
Post-Bid
Less than $140,700,000 est. value
Boston, MA 02129

In-Situ Chemical Cleaning of Filter Media and Filter Underdrains
Post-Bid
Less than $300,000 est. value
Westfield, MA 01085

Knowles Crossing Water Treatment Plant Membrane Replacement
Results
Less than $90,000 est. value
Truro, MA 02666

Patton Water Treatment Plant & Shabokin Water Treatment Plant - Filed Sub Bids
Results
$23,300,000 est. value
Devens, MA

High Street Water Treatment Plant Project - General Bid
New Construction
Construction
Less than $13,500,000 est. value
Bridgewater, MA 02324

Hanover Crossing Wastewater Treatment Plant
New Construction - 4,000 SF
Construction
$500,000 to $1,000,000 CJ est. value
Hanover, MA

Remove and Replace Exiting Air Stripper Packing Media in an Existing Air Stripper
Post-Bid
Canton, MA

Whitcomb Avenue Water Treatment Plant - General Bids
Results
Less than $15,900,000 est. value
Littleton, MA

Patton Water Treatment Plant & Shabokin Water Treatment Plant - General Bids
Construction
Less than $23,300,000 est. value
Devens, MA

Preventive Maintenance and Repair Services at Water Treatment Systems
Post-Bid
Shrewsbury, MA

MacPherson Well PFAS Water Treatment Plant (WTP) Project - General Bids
Results
$2,229,889 est. value
Devens, Shirley, MA 01464

Witch Pond Treatment Plant Filter Rehabilitation
Post-Bid
$150,000 est. value
Foxborough, MA

Whitcomb Avenue Water Treatment Plant - Filed Sub Bids
Results
Less than $15,900,000 est. value
Littleton, MA

Reported 06/15/2022 04:18 PM
Project Title

Wastewater Treatment Facility Upgrade - Phase 2 - City of Taunton

Physical Address View project details and contacts
City, State (County) Taunton, MA 02780   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $31,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Taunton’s Phase 2 of the WWTF Upgrade project consists of a complete upgrade of the Taunton Wastewater Treatment Facility (WWTF). Improvements to the WWTF are required to meet the requirements of the new NPDES discharge permit. This phase will increase the level of treatment at the WWTF for Total Nitrogen. As of June 14, 2022, this project is included in the Board of Trustees Meeting Asset Management Planning Commitments. Further details regarding design completion and firm construction timelines have not been identified.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents