Similar Projects
Sun Communities Mobile Home Park
New Construction
Conception
Fort Collins, CO

Creekwalk
New Construction - 50,000 SF
Design
$10,000,000 est. value
Colorado Springs, CO 80900

Talon Pointe
New Construction
Design
$10,000,000 est. value
Thornton, CO

PKAA, Monte Cristo Project Osm #715N
Bidding
Denver, CO

Virginia Canyon Soda Project 721N
Bidding
Denver, CO

PKAA, Todd Gulch Mine Closure Project #653E
Post-Bid
Denver, CO

Pkaa, Fy2020, Mesa County Coal Refuse Project (572E)
Post-Bid
CO

Boat Ramps and Two Parts of the Trail Extension
Results
Denver, CO

Shook Sub-Division Filings 3 and 4 Infrastructure Project
Results
Centennial, CO

Arapahoe Crossing Multi Tenant G & S
New Construction - 6,100 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Aurora, CO 80016

Avilla Prairie Center
New Construction
Construction
Brighton, CO 80601

Fillmore West Retail
New Construction, Addition - 9,000 SF
Pending Verification
$800,000 to $1,000,000 est. value
Colorado Springs, CO 80907

Ent Credit Union Parking Spaces
Renovation
Pending Verification
Colorado Springs, CO 80923

Garden Ranch YMCA
Renovation
Design
Colorado Springs, CO 80918

Prairie Center Village I - Phase II Improvements
New Construction
Bidding
Brighton, CO 80601

Last Updated 05/20/2019 04:38 PM
Project Title

Nordstrom Rack at Orchard Towne Center

Physical Address View project details and contacts
City, State (County) Westminster, CO 80023   (Adams County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Shopping Center/Strip Mall, Site Development
Contracting Method
Project Status Construction Commenced June 2018, Construction Complete as of March 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description New +/- 25,500 sf core shell, tenant finish and associated site work. Please provide bids with breakouts as required per the Owner Bid Form located in the documents folder and attached to GTC`s Bid Form. PLEASE NOTE THAT CORE SHELL AND TENANT FINISH PLANS AND SPECIFICATIONS ARE SEPARATED, BE SURE TO DOWNLOAD BOTH SETS OF PLANS AND SPECIFICATIONS. New scope added in Addendum #01 for Pads 7 and * site improvements and Core/Shell
Details 1 Shopping Center/Strip Mall, 1 Story Above Grade, 25,569 SF Renovation, 1 Site Development, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents