Similar Projects
Electrician to Install New Light Fixtures
Alteration
Bidding
$3,000 est. value
Hannibal, MO

Water Filtration Plant High Service Pump #3 Replacement and VFD Installation
Infrastructure
Bidding
$200,000 est. value
Sedalia, MO 65301

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Henry County Electrical Improvements - Summer 2021
Post-Bid
Windsor, MO

Solar Array, Interior Lighting and Roof Replacement-Trenton Field Maintenance Shop and Readines
Results
Trenton, MO 64683

Plugging of Well 10, Well 11, and Voss Well
Infrastructure
Results
Sullivan, MO

Water Filtration Plant Replacement of Two (2) Backwash Wet Well Submersible Pumps and Controller
Infrastructure
Bidding
$200,000 est. value
Sedalia, MO 65301

Lighting Upgrade-Energy Loan
Alteration
Post-Bid
Rolla, MO 65409

JCHMF Phase 2 – Water Supply Well
Infrastructure
Results
Carthage, MO

Community Center Generator Addition
Alteration
Bidding
$220,000 est. value
Carl Junction, MO 64834

Preservation Square Phase 2B - Public Improvements Package
Alteration
Post-Bid
Saint Louis, MO 63106

Submersible Pump and Motor for the WWTP East Well
Infrastructure
Results
Lebanon, MO

Generator Services - 2022
Term Contract
Bidding
Saint Louis, MO 63110

Electrical and High Voltage Services
Alteration
Post-Bid
Maryville, MO

Water Well Pump Maintenance Services
Term Contract
Results
Lebanon, MO

Last Updated 05/20/2022 02:31 AM
Project Title

Replacement of Water Well Pump, Piping and Electrical Wiring at Golf Course Irrigation Lake

Physical Address View project details and contacts
City, State (County) Fulton, MO   (Callaway County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Water Well Pump, Piping and Electrical Wiring at Golf Course Irrigation Lake.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents