Similar Projects
Pembina Sprinkler Head Corrections
Renovation
Sub-Bidding
$100,000 CJ est. value
Pembina, ND 58271

HVAC-R Repair and Maintenance - Time & Materials
Renovation
Sub-Bidding
$400,000 CJ est. value
Valley City, ND 58072

Rocking Horse Farm ES HVAC Equipment
Term Contract
Post-Bid
Fargo, ND 58104

Joann Hetzel Memorial 4-H Building
Infrastructure
Post-Bid
Bismarck, ND 58501

Fargo Sub Service, Repair, Replace A/C Condensing Unit and Evaporator
Term Contract
Results
West Fargo, ND 58078

Selke Hall Make-Up Air Unit Replacement
Alteration
Results
Dickinson, ND 58601

City Auditorium Air Conditioning Installation
Alteration
Post-Bid
New Salem, ND 58563

Northern Cass School Heat Pump Replacement
Alteration
Results
Hunter, ND 58048

FARGO FB/PO Fan Coil Replacement Value
Term Contract, Alteration
Post-Bid
$25,000 to $100,000 est. value
Fargo, ND

Ben Franklin AC Upgrades
Alteration
Results
Fargo, ND 58102

Columbia Hall - Corn Research Refrigeration
Alteration
Post-Bid
$90,000 est. value
Grand Forks, ND 58203

Abbott Hall Fume Hood Demolition and Install
Alteration
Results
Grand Forks, ND 58202

Existing Johnson Controls HVAC Systems Services with Related Products and Services
Alteration
Post-Bid
Bismarck, ND

VCSU Campus HVAC
Alteration
Results
Valley City, ND 58072

HVAC Improvements for 2001 High Service Pump Station
Alteration
Post-Bid
$60,000 est. value
Grand Forks, ND

Last Updated 05/12/2023 09:37 AM
Project Title

Fairmount Public School 2024 HVAC Improvements

Physical Address View project details and contacts
City, State (County) Fairmount, ND 58030   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,320,766 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 12, 2023, project was awarded, anticipated start date is immediately** Fairmount Public School 2024 HVAC Improvements One combined bid will be accepted - All Mechanical, Electrical, General, labor and material required to provide a complete project. No bidder may withdraw a bid for 30 days following the bid opening without a written request explaining the cause of the withdrawal and without written consent of the Owner after reviewing the cause. Liquidated damages shall be in effect for this project. See Bid Form and Instruction to Bidders for details. Each bid must be accompanied by a certified check, cashier's check or draft in the amount of 5% of the base bid plus all add alternates, or a 10% bid bond issued by a surety authorized to do business in the State of North Dakota and made payable to the "Fairmount Public School No. 18, Fairmount, North Dakota". The Fairmount Public School Board reserves the right to accept or reject any or all bids and to waive any irregularities therein. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents