Similar Projects
Gym Air Conditioning at Middle/High School
Renovation
Design
$205,666 CJ est. value
Crivitz, WI 54114

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

HVAC Upgrades Fire Station 2 and Fire Station 3
Results
Appleton, WI 54915

HVAC Upgrades Fire Station 2 and Fire Station 3
Results
Appleton, WI 54915

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

HVAC Renovations - Fond Du Lac County Government Center
Alteration
Post-Bid
Fond du Lac, WI 54935

Kenosha County Detention Center Rooftop Equipment Replacement Phase 1
Term Contract
Results
Kenosha, WI 53144

Courthouse Split A.C. System for Data Room
Alteration
Post-Bid
Portage, WI 53901

13th Street Roof and HVAC Upgrades
Alteration
Results
Milwaukee, WI 53221

Central Fleet Maintenance HVAC Replacement
Alteration
Post-Bid
Wauwatosa, WI 53226

Jail Huber Dorm HVAC Remodel
Alteration
Results
$350,000 est. value
Merrill, WI 54452

Water Heater Repair/Replacement Services
Term Contract
Post-Bid

Ice Arenas Condenser Replacements
Alteration
Results
Brookfield, Delafield, WI 53018

Cooling Tower Rebuild
Alteration
Post-Bid
Lac du Flambeau, WI 54538

Last Updated 03/08/2023 11:06 PM
Project Title

Chimney Repair Louis Smith Tainter House

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $95,539 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014 Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. General Project Description: This project involves the reconstruction of the upper courses of the southeast chimney with new sandstone masonry to match the original unweathered shapes, profiles, and dimensions of the original Dunnville Sandstone masonry. The project scope includes the following work: removal and salvaging the existing sandstone masonry, new sandstone masonry, carpentry chimney cap support with rigid insulation and stainless27 steel angle attachment, lead coated copper cap with soldered seams and WeatherCap System. General Site Information: The repair work is limited to the upper courses of the southeast chimney at the University of Wisconsin - Stout Louis Smith Tainter House, 320 South Broadway Street. Refer to drawing sheet A001 - Site Utilization Plan & Aerial Photo & Site Notes for details regarding the project location and site utilization. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. The successful Contractor must agree to commence work on or after a date to be specified in a written "Notice to Proceed" and to fully complete all work within 173 consecutive calendar days thereafter. Completion time will be converted to a specific date at the time the "Notice to Proceed" is issued. Refer also to Conditions of the Contract for Simplified Projects, Article entitled "Time for Completion". The project construction start is anticipated to begin in April 2023 with submittals and stone procurement, with on-site construction beginning in May 2023 and final completion in September 2023.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents