Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

East Christiana Street Waterline Replacement - Rebid
Infrastructure
Bidding
$300,000 CJ est. value
Martinsburg, PA 16662

2022 CDBG Street Reconstruction Project
Infrastructure
Post-Bid
Altoona, PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Milling of Bituminous Pavement
Infrastructure
Results
Tyrone, PA

County Road 101 Rehabilitation Project
Infrastructure
Results
Hollidaysburg, PA

Self Storage - Patton Township
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Altoona, PA 16601

Blair Gap Run Bridge
Demolition, New Construction, Infrastructure
Conception
$3,942,800 CJ est. value
East Freedom, PA 16637

I-99 Newry Pulloff to Plank Rd Intchg
Infrastructure
Design
$11,150,000 CJ est. value
Juniata Township, PA 16635

Garden Heights Neighbourhood Stormwater Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Altoona, PA 16601

2022-2023 Road Utility Cut Restoration Project
Infrastructure
Post-Bid
Altoona, PA

Last Updated 03/06/2023 02:35 PM
Project Title

North 7th Avenue and North 11th Street Roadway Reconstruction

Physical Address View project details and contacts
City, State (County) Altoona, PA 16601   (Blair County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $345,433 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 6, 2023, project was awarded to Grannas Bros. Stone & Asphalt, awarded amount is $345,432.60. North 7th Avenue and North 11th Street Roadway Reconstruction CLARIFICATION DEADLINE 1/26/2023 12:00 PM Work performed on this project to be as per current Pennsylvania Department of Transportation Publication 408, as amended and revised. Either an original Certified Check, Official Check, Cashier's Check, or Bid Bond drawn to the order of the "City of Altoona" equal to ten (10%) percent of the amount of the bid must be submitted with the proposal. Note that the Bid Bond must be in effect for a period of sixty (60) days from the bid opening date. Mayor and City Council reserve the right to reject any or all bids and waive any informality not material to the bid and to award the contract as may be deemed to the best interest of the City of Altoona. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents