Similar Projects
Well Inspection and Pipe Modification
Infrastructure
Bidding
Pembroke, GA

Municipal Non-Potable Irrigation Well Drilling Service
Infrastructure
Bidding
Clarkston, GA

Deep Well and Chemical Feed Building
Post-Bid
Less than $600,000 est. value
Pavo, GA 31778

Gill Street Well Improvements
Post-Bid
Ellaville, GA

Pump Repair Service
Term Contract
Results
Atlanta, Chamblee, Decatur, Ellenwood, Lithonia, Snellville, Stone Mountain, Tucker, GA

Pump Repair Service
Term Contract
Results
Atlanta, Chamblee, Decatur, Ellenwood, Lithonia, Snellville, Stone Mountain, Tucker, GA

Garnsey Range Water Well Treatment Facilities
Infrastructure
Bidding
Columbus, GA

N041--509-20-4-5102-1054 Heating Water Pump in Room GG100
Post-Bid
Augusta, GA 31021

Variable Speed Pump System and Installation
Results
Albany, GA 31701

N041--509-20-4-5102-1054 Heating Water Pump in Room GG100 (VA-20-00076166)
Post-Bid
Augusta, GA 30904

Wet Well Cleaning and Disposable Services
Results
Morrow, GA 30260

Replace Two Water Well Bladder Tanks
Post-Bid
Griffin, GA 30223

Forrester Parkway, 1,000 GPM Deep Well
Results
Less than $725,000 est. value
Leesburg, GA 31763

F. Wayne Hill Water Resources Center (WRC) Backwash Waste Pump Replacement
Post-Bid
Buford, GA 30519

Garnsey Range Potable Water Well
Term Contract
Results
Columbus, GA 31829

Last Updated 09/01/2021 05:34 PM
Project Title

2020 Water System Improvements - Andrews Well 2

Physical Address View project details and contacts
City, State (County) Carnesville, GA 30521   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of one submersible pump and associated appurtenances The Project consists of, but is not limited to the following major elements: Development of one existing well including installation of submersible pump, motor and controls.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents