Similar Projects
Ground Source Heating Pump, Fort Bragg NC.
Post-Bid
Fort Bragg, NC 28307

Raw Water Wells
Post-Bid
Laurinburg, NC 28353

Y--Replace Potable Water Wells and Install Raw Water Main
Results
$1,000,000 to $5,000,000 est. value
Cherry Point, NC 28533

Raw Water Intake Improvements
Results
Raleigh, NC

Contract III - 2020 USDA Well Building Improvements
Post-Bid
Red Springs, NC 28377

Well No. 4 Replacement
Results
Less than $519,975 est. value
Pinetops, NC

Monitoring Well Abandonment
Post-Bid
NC

Design-Build Delivery of the Cape Hatteras RO Wellfield Expansion
Results
Frisco, NC 27936

Raw Water Pump and Motor
Post-Bid
Camp Lejeune, NC

NRRRF RAS Screw Pump Replacement
Results
Less than $4,300,000 est. value
Raleigh, NC 27610

Portable Hydraulic Power Unit and Hydraulic Power Head
Post-Bid
Camp Lejeune, NC 28547

Water Treatment Plant Finished Water Pumping Improvements
Results
Carrboro, NC

Maintenance and Repair of Screw Pumps
Post-Bid
Camp Lejeune, NC 28547

I-40/NC-403 Well Head and Manganese Treatment System
Results
NC

Stoney Point Elementary Loop Pump Replacement
Post-Bid
Fayetteville, NC 28302

Reported 04/30/2021 04:28 PM
Project Title

Replace Existing Raw Water Pump Project

Physical Address View project details and contacts
City, State (County) Kings Mountain, NC   (Cleveland County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes providing a new 10 million gallon per day (MGD) Raw Water Pump to replace one of the existing pumps with a new 150 horsepower pump (HP). The pump shall be a Peerless Pump, a duplicate in model to the Citys existing 75 HP Peerless Pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents