Similar Projects
Blaine Public Works Well Drilling
Infrastructure
Bidding
Blaine, MN

Municipal Well No. 8 and Well House
Infrastructure
Bidding
Le Sueur, MN

2021 Booster Pump Nos. 4 and 5 Improvements
Post-Bid
Anoka, MN

Supernatant Pump and Provide Training
Post-Bid
Minneapolis, MN

Municipal Well No. 5 & DNR Compliance (Monitoring) Well
Results
Carver, MN

Capping the West Well
Results
Rochester, MN 55906

Well House No. 8
Infrastructure
Bidding
Caledonia, MN

Hill Annex Observation Well Drilling
Post-Bid
$368,000 est. value
Calumet, Marble, MN

By-Pass Pumping
Results
Minneapolis, MN

Pine and Kanabec Counties Sonic Drilling
Infrastructure
Bidding

Horse Camp Well Pump Replacement
Post-Bid
Spring Valley, MN 55975

WWTF Pump and Diffuser Improvements
Results
Less than $1,750,000 est. value
New Ulm, MN

Booster Station and Well 16 Rehabilitation
Renovation, Infrastructure
Bidding
Blaine, MN

Mystery Cave State Park - Well Pump
Renovation
Post-Bid
Spring Valley, MN 55975

High Service Pump 4 & Backwash Pump 11 Rehabilitation
Results
$105,000 est. value
Lakeville, MN

Reported 06/05/2021 12:00 AM
Project Title

DNR2 Blaine Public Works Well Drilling

Physical Address View project details and contacts
City, State (County) Blaine, MN 55449   (Anoka County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary to legally and correctly drill and seal boreholes (if necessary) and install and complete two (2) environmental wells in the State of Minnesota. This includes any and all reports that may need to be filed with the MDH. Copies of any reports filed shall be sent to the appropriate MDH representative & and Project Supervisor. All work pertaining to the drilling of boreholes, installation of well materials, well sealing, and pump removal must be done by contractors licensed in accordance with the Water Well Construction Code as specified in Minnesota Statutes.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents