Similar Projects
JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Noble Hall AHU Replacement
Results
Less than $365,000 est. value
Greensboro, NC

Smith Technology Building Cooling Tower Replacement
Results
Less than $500,000 est. value
Greensboro, NC

Carver and Webb Halls Fume Hoods Replacement
Post-Bid
Greensboro, NC

McIver HVAC Addition for McIver School
Results
Greensboro, NC 27405

Construction of Ductwork Modifications
Post-Bid
Greensboro, NC 27411

IRC Building Chiller Replacement
Results
Less than $500,000 est. value
Greensboro, NC

HVAC Repair and Maintenance Services
Term Contract
Post-Bid
NC

Chiller Maintenance for the Engineering and Inspections Department
Term Contract
Results
Greensboro, NC 27401

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

Cone ES RTU Replacement
Post-Bid
Greensboro, NC 27405

High Point Mental Health HVAC Renovations
Results
High Point, NC 27260

Chiller Plant Replacement for Southern Elementary School
Post-Bid
Greensboro, NC 27406

Last Updated 01/14/2021 11:20 AM
Project Title

Cooling Tower Replacement and Installation at Bryan Building

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27412   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace an existing BAC Model Cooling Tower Units and perform installation of subsidiary equipment, at quoted Time and Material rates at the University of North Carolina at Greensboro (University) campus. At a minimum the contractor should be able to perform the following: • Remove and properly dispose of existing BAC Model 15350D Cooling Tower. • Remove all necessary piping, controls and electrical from existing cooling tower. • Replace existing beams and isolators with new steel support beams to accommodate the new cooling tower, if necessary. • Provide new comparable cooling tower. • Set and secure new cooling tower. • Modify existing inlet, return, and overflow piping to conform to the new tower configuration. • Wire motor(s) and other control features to existing electrical circuit in accordance with NC Electrical Code. • Make other modifications as required to accommodate the new tower. • Replace Sump Level Sensor and connect to make-up valve above chiller

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents