Similar Projects
Last Updated | 07/18/2023 01:32 PM |
Project Title | Replacement of All 76 Exterior Windows |
Physical Address | View project details and contacts |
City, State (County) | Columbia, MO 65201 (Boone County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $532,600 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of all 76 exterior windows at Boone Medical Plaza 3 1701 E. Broadway Columbia, MO. For further details of the scope of work, please contact Rene Heider at rh53312@boone.health. Rene' Heider Planning Design & Construction Boone Health Columbia, MO 65201 573-815-3325 Replace 75-76 exterior windows at Boone Medical Plaza 3 1701 E. Broadway. Please review the quantity before bidding. Work to be completed Summer 2023 Replace existing windows with Bronze Anodized framing and bronze LOW E Glass to match other Boone Medical Group Buildings. Provide dumpster. Remove existing window casing and reinstall. Add prime stained wood filler trim between the reinstalled casing and the new window anodized frames. Ensure all rough openings between the casing and window frame are finished with wood stained to match existing casing. Mud, tape and finish existing window tie into walls. Finishing carpenter & replace interior window trim work if can't reuse existing. The contractor will need to coordinate scheduling with the project manager and the team will need to meet the needs of the tenants. Weekend work in DaVita for 15 windows. Project is prevailing wage. Building permits are not required but the new windows must meet the 2018 standards for uvalue and solar heat gain coefficient. Temporary barrier walls will be needed in suites and provide walk off mats to mitigate dust and debris. Job site must be cleaned daily. Provide performance and payment bond. Provide project supervision. Subcontractors responsible for demo The contractor will be responsible for moving furniture to provide access to exterior walls. The hospital will be responsible for removing computers and personal items. Staging can be done in parking lot across from Jack Estes What take out must be put back the same day if not subcontractor to board up window. Final clean of each suite. Not all mullions will line up with the existing walls already in place. Will need some Mullion Mattes or Mull-IT-Over closures. Bids due by 6/9 at 2:00 pm. Please email to rh53312@boone.health |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |