Similar Projects
Barkley Extension - City of Albany
Infrastructure
Conception
$969,354 CJ est. value
Albany, GA 31705

Barkley Extension - City of Albany
Infrastructure
Conception
$969,354 CJ est. value
Albany, GA 31705

Oglethorpe Bridge / SR 520 BU at Flint River
Demolition, New Construction, Infrastructure
Design
$16,000,000 CJ est. value
Albany, GA 31705

SR 91 From SR 234 to Lee County Line
Infrastructure
Design
$5,000,000 CJ est. value
Albany, GA 31701

Street and Parking Resurfacing
Infrastructure
Bidding
$400,000 CJ est. value
Albany, GA 31701

Street and Parking Resurfacing
Infrastructure
Bidding
$400,000 CJ est. value
Albany, GA 31701

U-Haul Ubox Building / Albany
New Construction, Infrastructure - 9,233 SF
Sub-Bidding
$3,000,000 CJ est. value
Albany, GA 31701

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Albany Pipe Rehabilitation
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Albany, GA 31701

Street Resurfacing Phase A / TSPLOST - FY21-22
Infrastructure
Results
Albany, GA

Street Resurfacing Phase B / TSPLOST - FY21/22
Infrastructure
Results
Albany, GA

Albany State University Nursing and Health Science Simulation Lab Facility
New Construction, Infrastructure - 20,000 SF
Construction
$8,000,000 CJ est. value
Albany, GA 31705

Widening on SR 133
Infrastructure
Construction
$43,353,383 CJ est. value
Albany, GA 31705

Jefferson Street Living and Learning Center
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Albany, GA 31701

North Washington Extension - City of Albany
Infrastructure
Conception
$250,000 CJ est. value
Albany, GA 31701

Last Updated 08/24/2023 02:16 PM
Project Title

Pointe River Apartments

Physical Address View project details and contacts
City, State (County) Albany, GA 31721   (Dougherty County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Misc. Recreational, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 24, 2023, this project is under construction. Project consists of a new apartment building, with leasing/community space within building, a pavilion, site amenities and all associated site work. PLEASE NOTE: - Great Southern encourages MBE/WBE participation for the Pointe River project. As a subcontractor or vendor, please provide your certification along with your bid submission if you qualify. - DCA/NGBS: All subs must reference A0-2.1, A0-2.2 & A0-2.3 for DCA & National Green Building Standard requirements, notes & score sheet. All requirements as it pertains to your scope of work must be included in your proposal. - turnkey bids for each trade's specialty requested. - Be sure your proposal includes detailed breakdowns with a written scope of work. - Base bids must be strictly per plans and specifications. If there are any conflicts, bid to the most stringent requirements. If there are any questions or gray areas as to the extent of your scope of work, clearly state any exclusions. - Negotiated GC is looking for VE options. Please give value engineering deduct options to your base bid. Show VE pricing as a deduct to your per plan base bid or give an alternate VE bid in addition to your per plan bid. VE only bids will NOT be accepted. - Price per current market conditions with the best pricing guarantee you can offer. Include your price hold guarantee timeline in your proposal. If possible, provide options for securing long term pricing guarantees or pre-purchase and warehousing. - If you would like a cost escalation agreement (where Negotiated GC would pay for any material price increases from the time of subcontract agreement to the time of material delivery), you must provide supplier quotes showing quantities of materials and unit pricing along with your proposal.

Details

3 Stories Above Grade, 65,985 SF. Parking Spaces, 123 Parking Spaces. 1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents