Last Updated | 08/24/2022 12:01 AM |
Project Title | California Institution for Men Air Cooling, Facility A |
Physical Address | View project details and contacts |
City, State (County) | Chino, CA 91710 (San Bernardino County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $11,108,918 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Questions and Answer Addendum Posted 5:00PM July 19, 2022 The proposals relate to the performance of the following work: The work associated with the California Institution for Men (CIM) Air Cooling; Facility A project will be located inside the existing Facility A secure perimeter. This project will install new roof-mounted heating, ventilation, and air conditioning (HVAC) equipment to replace existing roof-mounted heating and ventilation equipment at the eight Facility A Housing Units, as well as associated electrical and plumbing work. Work includes the demolition of existing roof-mounted equipment, the installation of new HVAC units and the associated electrical, condensate drainage, and housing unit roof repair work. Additional work includes the installation of temporary fencing at Mariposa housing unit, configured to ensure unobstructed access to the adjacent maintenance/canteen building, as well as any infrastructure connections required to complete the project scope of work THIS BID PROPOSAL MUST MEET THE DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) 3% PARTICIPATION GOAL. ONLY THOSE PROPOSALS THAT INCLUDE THE MINIMUM 3% DVBE PARTICIPATION WILL BE CONSIDERED. Contact the CDCR DVBE Representative, Nina Martinez, at (916) 255-3029 or via e-mail at Nina.Martinez@cdcr.ca.gov for DVBE assistance Contact the CDCR DVBE Representative, Nina Martinez, at (916) 255-3029 or via e-mail at Nina.Martinez@cdcr.ca.gov for DVBE assistance. Deadline for Pre-Bid Walk-Through Clearance Requests 4:00PM June 15, 2022 Questions and Answer Addendum Posted 5:00PM July 15, 2022 Anticipated Date for Commencement of Services August 29, 2022 Final Completion 768 Calendar Days after Issuance of Official Notice to Proceed Questions regarding the bid will be answered by an addendum, if received in writing, via email to Katherine.reyna@cdcr.ca.gov, by the time and date specified in the Projected Timetable. Questions received after this time will not be answered. The successful bidder shall furnish bonds, insurance, and other documents as specified in the Instruction to Bidders The Department of Corrections and Rehabilitation reserves the right to reject any or all bids, to waive any irregularity in any bid, and to award a contract for any part or whole of the project. Bidders security in the amount of ten percent (10%) of the bid, and appropriate licensing are required of all bidders. The States Estimate for the project is approximately $11,700,000. Deadline for Bidder Questions 5:00 pm on July 01, 2022. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |