Similar Projects
Seal Bituminous Pavement Cracks and Crack Sealing
Infrastructure
Bidding

3rd Avenue Mill and Overlay and Sidewalk Improvements
Post-Bid
Less than $125,000 est. value
Watertown, MN

3rd Avenue Mill and Overlay and Sidewalk Improvements
Post-Bid
Less than $125,000 est. value
Watertown, MN

Water System Expansion Utility Improvements
Results
Carver, MN 55315

Bituminous Milling and Surfacing, Ultrathin Bonded Wearing Course, and ADA Improvements
Results
MN

Madelyn Trail Single Family Homes
New Construction, Infrastructure
Pending Verification
Victoria, MN 55386

Chaska Bluffs
New Construction, Infrastructure
Pending Verification
Chaska, MN

North Smoky Hills Graveling
Renovation
Post-Bid

Jonathan Carver Parkway
Results
Chaska, MN

Site1602-1603 Asphalt Paving
Alteration
Post-Bid
Chaska, MN

2021 Crack Sealing
Results
MN

East Frontage Road Parking Lot
Infrastructure
Post-Bid
Waconia, MN 55387

CSAH 50 Safety Improvements / CSAH 43 Mill and Overlay
Results
$2,500,000 to $5,000,000 est. value
Cologne, MN

2021 Infrastructure Improvements
Results
Waconia, MN

2021 Sealcoating
Results
$63,000 to $70,000 est. value
Chanhassen, MN

Last Updated 07/17/2021 02:04 AM
Project Title

Construction of Sanitary Sewer, Water Main, Services, Storm Sewer, and Streets

Physical Address View project details and contacts
City, State (County) Chaska, MN 55318   (Carver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing of labor and materials and all else necessary for improvements, consisting primarily of the following estimated quantities: Clover Ridge Drive / Frey Property Chaska Creek Blvd, Phase 2 In general, Work consists of the new construction of sanitary sewer, water main, services, storm sewer, and streets. The Project consists of the following approximate quantities: 4 EA Sanitary Structures 970 LF 8” to 18” PVC Sanitary Sewer 1350 LF 6” to 20” PVC Water Main 1700 LF 15” to 36” RCP Storm Sewer 24 EA Storm Sewer Structures 4000 LF 4”, 6” and 8” Drain Tile / Sump Lines 3500 CY Common Excavation 14,000 SY Geotextile Fabric Type V 10,000 CY Select Granular Borrow 12,000 TN Class 5 Aggregate Base 4000 TN Bituminous Pavement 6000 LF Concrete Curb and Gutter 8000 SF Concrete Sidewalk and Driveways 1500 SY Sod and Blanket Along with miscellaneous utility improvements, removals, restoration, signing, striping, clearing and grubbing, and correlated appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents