Similar Projects
DFCM Construction UDOT Salt Lake West Maintenance Facility
New Construction
Construction
Less than $6,300,000 est. value
Salt Lake City, UT 84128

Replace Existing Bus Wash System
Post-Bid
Lindon, UT

Construction of a New Public Works and Parks Operations Maintenance Facilities
New Construction, Renovation - 39,360 SF
Results
West Valley City, UT 84119

Pre-Qualification of General Contractors - Part I
Results
West Jordan, UT

U of U E - Bus Charging Station
Results
Less than $130,000 est. value
Salt Lake City, UT 84113

Bus Barn Renovation
Renovation
Post-Bid
Park City, UT 84060

New Transportation Facility
Construction
West Jordan, UT 84088

Powder Mountain Helipad
New Construction
Design
Eden, UT 84310

Weber State University Bus Rapid Transit (Brt) System
Results
Ogden, UT

WCSD Transportation Facility Addition
Addition
Post-Bid
Saint George, UT 84790

Last Updated 04/08/2019 05:28 PM
Project Title

Mineral Mountain Guzzler Apron

Physical Address View project details and contacts
City, State (County) Cedar City, UT   (Iron County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Building materials requested will consist of complete pre-fabricated kits including ribbed steel panels, steel beams/purlins, gutters, and all required fasteners for construction of 3 (three) Guzzler aprons. Each Guzzler “kit” consists of 32 ribbed sheet metal panels supported by a 24’ x 36’ steel frame. Each Guzzler’s frame is made from 8 steel 6”x 9”x18’ I-beams joined by ½ inch thick end plates bolted together and beams cross-braced with 21 “zee” purlins and 6 “cee” purlins attached to purlin clips welded to the I-beams (see photos 3 and 4 and attached drawing: section A-A).
Details
Division 03 - Concrete, Concrete Accessories, Concrete Construction Joints.
Division 05 - Metals, Structural Steel Framing, Steel Joist Framing.
Division 07 - Thermal and Moisture Protection, Wall Panels, Metal Wall Panels, Formed Metal Wall Panels.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents