Similar Projects
Last Updated | 04/08/2019 05:28 PM |
Project Title | Mineral Mountain Guzzler Apron |
Physical Address | View project details and contacts |
City, State (County) | Cedar City, UT (Iron County) |
Category(s) | Transportation |
Sub-Category(s) | Misc. Structures |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Building materials requested will consist of complete pre-fabricated kits including ribbed steel panels, steel beams/purlins, gutters, and all required fasteners for construction of 3 (three) Guzzler aprons. Each Guzzler “kit” consists of 32 ribbed sheet metal panels supported by a 24’ x 36’ steel frame. Each Guzzler’s frame is made from 8 steel 6”x 9”x18’ I-beams joined by ½ inch thick end plates bolted together and beams cross-braced with 21 “zee” purlins and 6 “cee” purlins attached to purlin clips welded to the I-beams (see photos 3 and 4 and attached drawing: section A-A). | ||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |