Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Beigene Research & Development Campus
New Construction - 1,000,000 SF
Pending Verification
Pennington, NJ 08534

Roofing, Facade, and Building Envelope Engineering and Design Services
Alteration
Design
$2,500 to $6,000,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Architect-Engineering Services for the Princeton Plasma Innovation Center (PPIC)
New Construction - 85,000 SF
Post-Bid
$50,000,000 to $75,000,000 est. value
Princeton, NJ 08540

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Environmental Consulting Services
Post-Bid
$15,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Lead Monitoring and Technical Services
Post-Bid

Last Updated 08/02/2022 07:03 AM
Project Title

RFQ - Office Planning Feasibility Study

Physical Address View project details and contacts
City, State (County) Princeton, NJ 08540   (Mercer County)
Category(s) Laboratory, Professional Services
Sub-Category(s) Architectural, Engineering, Laboratory
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Energy (DOE) and Princeton Plasma Physics Laboratory (PPPL) requires services of a Professional Architect and Engineer (A/E) Subcontractor to provide a Feasibility Study for the renovation of existing underutilized spaces at PPPLs D Site within buildings D52 and D53. The existing spaces will be reviewed to maximize their use as office space. Options will be developed to identify the maximum utilization with varying degrees of existing systems infrastructure impact. Contractor shall be required to develop (3) options to replan existing spaces to accommodate office use in B52 & B52: a. Option 1 - Maximize office use with least/no impact to existing systems (life safety, restrooms, hvac, etc). b. Option 2 - Maximize office use with intermediate impact to existing systems. c. Option 3 - Maximize office use and capture all necessary upgrades to existing systems. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents