Similar Projects
Downtown Raton Infrastructure Project
Results
Less than $820,000 est. value
Raton, NM 87740

Camino Coyote Lane
Results
$701,403 est. value

Asphalt Millings Stockpile Crushing Project
Results
Raton, NM

Raton Municipal / Crews Field Airport Runways 2-20 and 7-25 Pavement Maintenance
Infrastructure
Results
Less than $391,395 est. value
Raton, NM

Hospital Drive Lift Station - Phase 2
Results
Raton, NM 87740

Construction of the 4th 5th Street Improvements
Infrastructure
Results
Maxwell, NM 87728

Angel Skye Apartments Sewer Connection
Infrastructure
Results
$180,138 est. value
Angel Fire, NM

Whittier Street Byron Avenue Reconstruction
Alteration
Results
$250,000 to $350,000 est. value
Raton, NM 87740

North Vail Infrastructure and Roadway Improvements
Infrastructure
Post-Bid
Angel Fire, NM 87710

Base Course Fill
Post-Bid

Wastewater System Improvements
Post-Bid
Maxwell, NM

San Mateo Drive-Spyglass Road Infrastructure and Roadway Improvements
Infrastructure
Results
Less than $1,300,000 est. value
Angel Fire, NM 87710

San Mateo Drive-Spyglass Road Infrastructure and Roadway Improvements
Infrastructure
Results
Less than $1,300,000 est. value
Angel Fire, NM 87710

Rainbow Boulevard Improvements Project
Infrastructure
Results

Camino Grande Improvements Phase III
Infrastructure
Post-Bid
Angel Fire, NM 87710

Reported 03/10/2022 12:00 AM
Project Title

Construction of the Country Club Drive - St. Andrews Way Infrastructure and Roadway Improvements

Physical Address View project details and contacts
City, State (County) Angel Fire, NM 87710   (Colfax County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Water distribution, sanitary sewer, storm drainage infrastructure, and roadway construction on St. Andrews Way and Country Club Drive to include new 6" C900 DR 18 waterline, new 8" SDR 35 PVC gravity sewer line, earthwork, various storm drain pipe and pipe arch, drop inlets, guard rail, gabion baskets, subgrade preparation, base course, curb and gutter, new HMA and other incidental work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents