Similar Projects
Willmar City Hall
New Construction
Conception
Willmar, MN

City Hall - Mechanical Systems Upgrade - MBC02 - City of Minneapolis
Renovation
Conception
$4,354,500 CJ est. value
Minneapolis, MN 55415

Public Works Building Expansion
Renovation, Addition - 50,000 SF
Design
Otsego, MN 55330

Revitalization of the Town Hall Building
Renovation
Design
$20,000,000 CJ est. value
Ely, MN 55731

Woodbury City Hall Boardwalk
Infrastructure
Bidding
$240,000 CJ est. value
Woodbury, MN 55125

Downtown Building Energy Transition - Rochester City Hall
Renovation
Bidding
$50,000 CJ est. value
Rochester, MN 55904

Public Works Facility
New Construction - 60,000 SF
Post-Bid
$12,000,000 est. value
Orono, MN 55356

Township Hall & Maintenance Garage
New Construction
Post-Bid
Mankato, MN

Juvenile Justice Center (JJC) C203 Courtroom Remodeling
Renovation - 900 SF
Results
$2,644,710 est. value
Minneapolis, MN 55415

Olmsted County Justice Center Remodel - General Construction Package
Renovation
Results
Rochester, MN 55904

City Hall Ground, 3rd and 4th Floors
Renovation
Construction
Duluth, MN 55802

Courthouse Improvements
Renovation
Post-Bid
Blue Earth, MN

Courthouse Remodeling
Renovation
Results
Waseca, MN 56093

South Saint Paul Phase 1 City Hall, Fire, Police Renovation
Renovation
Post-Bid
South Saint Paul, MN 55075

City Hall
Renovation
Results
Saint Paul, MN 55118

Last Updated 12/05/2022 05:18 PM
Project Title

Edina City Hall Energy Use and Lighting Improvements

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55424   (Hennepin County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,066,321 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Buildings/Public Improvements include replacement and retrofitting of lighting throughout the entire building, replacement of HVAC devices and controls, BAS System replacement, and misc. other MEP improve mentees. The work shall consist of furnishing labor, equipment, and materials necessary to complete design and specifications provided for project by HGA. Questions are due by September 9, 2022 by 11:00 AM and the bid submittal deadline is September 15, 2022 by 11:00 AM, The Edina City Council will meet at 7:00 pm, TBD to consider said bids. Council Award Date: November 15, 2022

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents