Similar Projects
Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Storm Drainage Improvements FY2018 CDBG
Post-Bid
Irwinton, GA 31042

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Replacement of the Streets and Drainage Improvements
Post-Bid
Jesup, GA 31545

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

36” CMP Rehabilitation
Post-Bid
GA

Sequoia Circle Drainage Improvements Phase II
Results
Hinesville, GA 31310

T32-D6-Drainage Rehab-Pickens-97322
Post-Bid
GA

Pooler Old Town Drainage - Project B
Results
Less than $811,700 est. value
Pooler, GA 31322

Drainage Base and Pave Construction
Post-Bid
Lyons, GA 30436

Crown Creek Crossings Drainage Improvements
Results
Dalton, GA 30719

T32-D6-Drain Rehab-Chattooga-97769
Post-Bid
GA

Last Updated 01/28/2020 04:12 PM
Project Title

Cherry-Church-Blanchard-King Avenues Drainage Improvements

Physical Address View project details and contacts
City, State (County) Pine Mountain, GA   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 450 linear feet of 76” x 48” elliptical RCP storm pipe, 430 linear feet of 68” x 43” elliptical RCP storm pipe, 250 linear feet of 60” x 38” elliptical RCP storm pipe, 310 linear feet of 24” RCP storm pipe, associated storm drainage structures, grading, curb and gutter, and appurtenances. The project also consists of relocation of approximately 160 linear feet of 6” water main and appurtenances along King and Blanchard Avenues.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents