Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Resurface - SH 199
Infrastructure
Design
$5,808,466 CJ est. value
Ardmore, OK 73401

Resurface - SH 199
Infrastructure
Design
$5,808,466 CJ est. value
Ardmore, OK 73401

Ice Rink Services
Infrastructure
Bidding
$175,000 CJ est. value
Ardmore, OK 73401

Excavation Services for Field District VII
Term Contract
Post-Bid
Anadarko, OK 73005

Ardmore Municipal Airport Corporate Hangar
Infrastructure - 14,400 SF
Post-Bid
$5,000,000 CJ est. value
Ardmore, OK 73401

Resurface (Asphalt) and Bridge Rehabilitation
Results
Dickson, OK

Joint Seal/Repair
Infrastructure
Results

Hangar Storm Sewer Improvements
Infrastructure
Post-Bid
$420,000 CJ est. value
Ardmore, OK 73401

Joint Seal / Repair
Infrastructure
Results

Slabjacking and Subsealing Services
Infrastructure
Results

Major Street Improvements
Infrastructure
Results
Ardmore, OK

Grade, Drain, Surface, and Bridge SH-53: From 6.4 Miles West of the I-35 Junction, Extend East Near Springer. Project Length 6.029 Miles
New Construction, Infrastructure
Results
OK

Resurface (Asphalt) US-70
Infrastructure
Results
OK

Resurface (Asphalt) SH-7
Infrastructure
Results

Last Updated 08/08/2022 09:51 AM
Project Title

Concrete Labor

Physical Address View project details and contacts
City, State (County) Ardmore, OK 73401   (Carter County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $606,100 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given that the city of ardmore, oklahoma, will receive and open sealed bids for the construction of 2022 concrete labor project a contract which provides for the repair, construction and finishing of concrete pavements, storm sewers and related structures throughout the City limits of Ardmore, Oklahoma. All bids timely received shall be considered by the City prior to a Contract being awarded. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and Holidays, before the time set for opening of bids, as well as bids received after the time set for opening of bids, will not be considered and will be returned unopened. The Bidder shall honor the quoted prices for a period of 60 days from the time the bids are opened. Bid security in the form of a cashier's check, a certified check, or a Surety Bond in the amount of five percent (5%) of the Base Bid shall accompany the sealed Bid of each Bidder. Bid security will be returned to the unsuccessful Bidders. The Bidder shall only use the City's Bid Proposal and affidavits or photocopies thereof. All forms must be signed and all affidavits sworn to and notarized. All bids shall be typewritten or in ink. Bidder shall file the bid in a sealed envelope. Each envelope shall bear a legible notation thereon that it is a bid upon the project proposed and the name of the Bidder. The Successful Bidder shall deliver the executed Contract and Bonds together with the certificates of insurance, all as required in the Contract Documents, to the City no later than fifteen (15) calendar days following the City's notification of its intent to award the Contract, unless that time is extended by the City. The City may issue addenda as may be necessary in the best interest of the public and the City. Addenda may amend the date and/or time for receipt of bids or any specification, item, document or requirement in the Contract Documents upon notice to all prospective Bidders who have purchased Contract Documents for this project. The Contract will be awarded to the lowest and best Bidder. The City reserves the right to reject any or all bids and reserves the right to waive immaterial defects and irregularities or award the bid by item/schedule or all/none as it deems to be in the best interest of the City

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents