Similar Projects
2020 Bond Athletics Bid Package No. 1
Bidding
Novi, MI 48374

Elementary Secure Entries
Bidding
Novi, MI

Beaumont Addition and Renovations, and Kettering and Mott High School Baseball Field Equipment
Renovation, Addition
Post-Bid
Waterford, MI

2016 Bond Projects - Bid Pack 7
Renovation
Post-Bid
Clarkston, MI

Troy School District Bond Projects BP23
Results
Troy, MI

2019 Sinking Fund Projects - Bid Package No. 1
Results
Lake Orion, MI

Detroit Country Day Middle School
Addition - 50,000 SF
Construction
$30,000,000 est. value
Beverly Hills, MI 48025

Serving Area Upgrades - RHS and AHS
Bidding
MI

Ferndale High School and Middle School Select Toilet Room Renovations
Renovation
Post-Bid
Ferndale, MI

2018 Bond 10 Bid Package 15 - 2019 Groves High School Remodeling
Results
Franklin, MI 48025

Construction Management Services
Bidding
Clawson, MI

Serving Area Upgrade
Post-Bid
Rochester Hills, MI

Stoney Creek High School Renovations 2020
Renovation
Results
Rochester, MI

Oxford Virtual Academy Expansion/Construction
Post-Bid
Oxford, MI

Huron Valley Schools 2019 Bond Program , BP 2
Results
Highland, MI 48357

Reported 01/04/2019 12:00 AM
Project Title

Royal Oak High School Remodeling

Physical Address View project details and contacts
City, State (County) Royal Oak, MI   (Oakland County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description This Project will consist of separate sealed Bids for the following Bid Divisions of work, for each of the projects noted above: 101 Earthwork and Site Utilities 102 Asphalt Paving and Exterior Concrete 103 Selective Demolition 104 Concrete Foundations 105 Concrete Flatwork 106 Masonry 107 Steel 108 Carpentry and General Trades 109 Roofing 113 Hollow Metal/Wood Doors/Finish Hardware 114 Aluminum Glass and Glazing 115 Metal Studs / Drywall / Plaster / EIFS 116 Hard Tile 117 Acoustical Ceilings 118 Carpet and Resilient Flooring 119 Epoxy Flooring 120 Painting 121 Visual Display Boards 125 Toilet Partitions 126 Lockers 127 Music Casework 128 Science Casework 137 Food Service Equipment 138 Electric Traction Elevators 140 Plumbing 141 Fire Protection 142 HVAC 143 Electrical 166 Artificial Turf
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents