Similar Projects
Pump Seals
Post-Bid
Yonkers, NY 10701

Backwash Pumps and VFD`s Replacement for the Water Treatment Plant
Post-Bid
Oneonta, NY 13820

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

United Wappinger Water District - Hilltop Well Connection
Post-Bid
Less than $320,000 est. value
Wappingers Falls, NY 12590

Town of Watson Water District #4 Extension #1
Results
Less than $6,000,000 est. value
Lowville, NY 13367

Water District 12 Wellfield Improvements Project
Post-Bid
Monroe, NY 10950

Complete Turnkey Rebuilding of an Existing Sulzer/Johnston Vertical Turbine Pump
Results
Millwood, NY 10546

Submersible Pumps
Post-Bid
White Plains, NY 10601

Furnish Submersible Pumps as Specified
Term Contract
Results
Syracuse, NY 13202

Replacement of the Fire Pump at Riverview Towers and Replacement of the Water Heaters
Post-Bid
Less than $230,000 est. value
Ogdensburg, NY 13669

Pumps - Premium Efficiency Solids Handling Pumps-Hydromatic
Term Contract
Results
Orangeburg, NY 10962

Screw Pump Replacement at Middletown WWTF
Post-Bid
Less than $600,000 est. value
Middletown, NY 10940

Last Updated 10/15/2021 04:41 PM
Project Title

Drilling of Wells and Test Borings

Physical Address View project details and contacts
City, State (County) NY   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For each zone bid, the Contractor shall have available a minimum of one (1) adequate drilling rig, as approved by the Engineer for the drilling of the test borings and production wells. The Contractor shall also have available at all times one competent crew and all tools, equipment, and supplies that may be necessary for Authority work during the life of the Contract. In addition, there may be times when the workload is such that two (2) rigs and two (2) crews are required for test boring and/or well construction work in a particular zone. The Contractor must be able to obtain the services of a second such crew and rig as needed in order to perform this additional work in a timely fashion, as dictated by the Engineer. This Contract will cover the period November 1, 2021 to October 31, 2022, with option to Extend.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents