Similar Projects
Faithful Friends Animal Sanctuary Parking Expansion
New Construction, Addition
Design
Wilmington, DE 19804

Parkview Apartments HVAC and Domestic Water Systems Replacement
Post-Bid
Wilmington, DE 19802

H146--Replacement SPS RO Water Filtration
Post-Bid
Wilmington, DE 19805

Delaware Youth and Family Center - Snowden Cottage - Boiler Replacement
Results
$172,000 est. value
Wilmington, DE

Bayard School – Drinking Fountain Replacements
Results
Wilmington, DE 19805

Z--Chiller Plant Preventative Maintenance Wilmington VA Medical Center
Post-Bid
Wilmington, DE 19805

Wilmington Manor Elementary School Boiler Replacement
Results
$100,000 est. value
New Castle, DE 19720

J045--Boiler Plant Maintenance Coatesville VAMC and Wilmington VAMC
Post-Bid
Wilmington, DE - Coatesville, PA

Boiler Inspection and Maintenance Services
Results
Wilmington, DE 19801

J045--Boiler Plant Maintenance Services Coatesville Vamc Wilmington Vamc
Term Contract
Post-Bid
Wilmington, DE 19805

J045--Boiler Tune-Up Coatesville VAMC Wilmington VAMC
Results
Wilmington, DE - Coatesville, PA 19805

H245--Boiler Safety Device Testing
Post-Bid
Wilmington, DE - Altoona, Coatesville, Erie, PA

Wilmington DMV – Sand Filtration Repairs
Results
Minquadale, New Castle, DE 19720

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Howard R. Young Correctional Institution – East Side Domestic Hot Water Boiler
Results
Less than $170,000 est. value
Wilmington, DE 19802

Last Updated 02/24/2020 07:10 AM
Project Title

Wilmington Readiness Center Boiler Replacement

Physical Address View project details and contacts
City, State (County) Wilmington, DE 19808   (New Castle County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of replacing an existing boiler with a new boiler. It also includes, but is not limited to, associated new controls, piping changes, additional pumps, gas piping, and venting. Attention is called to the construction schedule as detailed in the Contract Documents

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers, Heating Boiler Feedwater Equipment, Boiler Feedwater Pumps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents