Similar Projects
Celetti Parking Lot Addition
Infrastructure
Bidding
$200,000 CJ est. value
Rock Falls, IL 61071

Rehabilitate Airport Entrance Road and Parking Lot
Infrastructure
Bidding
$600,000 CJ est. value
Rock Falls, IL 61071

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

3rd Avenue Reconstruction
Infrastructure
Results
$1,396,391 est. value
Rock Falls, IL 61071

Oppold Marina Site Improvements
Infrastructure
Results
Sterling, IL 61081

Exceptional Care and Training Center
New Construction, Infrastructure - 49,600 SF
Pending Verification
$27,100,000 CJ est. value
Sterling, IL 61081

Construction of Section 4 of Hoover Park to Sauk Valley Community College Shared-Use Path
Infrastructure
Bidding
$420,000 CJ est. value
Sterling, IL 61081

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Watermain Replacement
Infrastructure
Results
Rock Falls, IL 61071

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Contract No. 2 - Wall Street and US Route 30 Watermain Loop
Infrastructure
Results
$337,980 est. value
Morrison, IL

Parking Lot Project (Grading, Gravel Drainage)
Infrastructure
Post-Bid
$285,000 est. value
Erie, IL 61250

Contract No. 1 - Customer Water Meter Replacement
Infrastructure
Results
$951,958 est. value
Morrison, IL

Hot-Mix Asphalt Overlay and Associated Work of Lyman Road within Portland Township
Infrastructure
Post-Bid
$231,259 CJ est. value
Newton Township, IL 61250

Last Updated 08/28/2023 04:01 AM
Project Title

Fire Hydrant and Storm Inlet Replacements

Physical Address View project details and contacts
City, State (County) Morrison, IL 61270   (Whiteside County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Proposed Work for Which the City of Morrison, Illinois is Soliciting Bids Consists of One Contract, fire Hydrant and Storm Inlet Replacements, and Includes the Following A certified check or bank draft, payable to the order of the City of Morrison negotiable U.S. Government Bonds (atpar value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total bid shall be submitted with each bid. The successful bidder will be required to furnish satisfactory performance and payment bonds each for 100% of the awarded contract price. The City of Morrison reserves the right to reject any or all bids or to waive any informality in the bidding All work shall be completed by April 12, 2024. “Replacement of six (6) Fire Hydrants and replacement of fourteen (14) Storm Inlets complete with necessary appurtenance and surface restoration.”

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents