Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Install Guardrail on KY-522 in Harlan County
Infrastructure
Conception
$634,000 CJ est. value
Totz, KY 40870

Welding Alloys Storage Building
New Construction, Infrastructure - 16,000 SF
Design
$1,700,000 CJ est. value
Florence, KY 41042

Arcadia / Grammas Investments
New Construction, Infrastructure - 31,000 SF
Design
$20,000,000 CJ est. value
Union, KY 41091

UK Indoor Track - Rebid - Foundation and Site Concrete
Infrastructure, Renovation
Bidding
$10,700,914 CJ est. value
Lexington, KY 40508

West Hickman Wastewater Treatment Plant RAS/WAS Pump Station Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Lexington, KY 40508

Storm Water Harvesting for Cup
Renovation, Infrastructure
Post-Bid
$2,000,000 est. value
Lexington, KY

Fayette County Elementary School Zone Enhancements Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Lexington, KY 40508

Baseball Field Backstop Safety System
Results
Union, KY 41091

Town Branch Scum Facility Improvements
Renovation, Alteration
Results
Lexington, KY 40504

2019 Water System Improvements Contract 12 - New Water Treatment Plant and Improvements
New Construction, Infrastructure
Construction
$1,180,000 CJ est. value
Sandy Hook, KY 41171

Sidewalks and Curbs at the William L. Wheeler Hall of Justice
Infrastructure
Construction
$55,005 CJ est. value
Carrollton, KY 41008

Blackburn Avenue Multi-Residential Development
New Construction, Infrastructure - 24,816 SF
Pending Verification
$6,000,000 CJ est. value
Lexington, KY 40508

Renaissance on Broadway
New Construction, Infrastructure - 20,000 SF
Pending Verification
$20,000,000 CJ est. value
Louisville, KY 40211

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Last Updated 12/28/2022 05:32 PM
Project Title

Leachate Pump Station Upgrade

Physical Address View project details and contacts
City, State (County) Glasgow, KY 42141   (Barren County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of installing two (2) 5 Hp Submersible Pumps and 460 LF of 6" HDPE Force Main, Meter Vault, and all necessary appurtenances. Each Bidder must accompany his bid with a Bid Bond in amount of not less than five (5) percent of the base bid. No Bidder may withdraw his bid for a period of ninety (90) days. The Bidder awarded the contract shall execute a 100% Performance Bond and a 100% Payment Bond and shall furnish insurance as required, in the General Conditions. The contract shall be completed within 45 calendar days after date of authorization to start work. Liquidated damages will be $500 per calendar day. Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Section 3, Section 109, Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act and the contract Work Hours Standard Act. Bidders must certify that they do not, and will not, maintain or provide for their employees any facilities that are segregated on a basis of race, color, creed, or national origin. Any bid that is obviously unbalanced may be rejected. The City of Glasgow reserves the right to reject any and all bids and waive informalities. Small, minority and women's businesses and labor surplus area firms are encouraged to bid this project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents