Similar Projects
Lift Station 317 Major Upgrade Progressive Design Build
Renovation
Bidding
Boynton Beach, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Lift Station 82 Rehabilitation
Post-Bid
Jupiter, FL

Irrigation Pump Stations, Repair Services, Term Contract
Term Contract
Results
West Palm Beach, FL 33415

Lift Station Nos.12 and 14 Improvements
Results
Less than $1,085,000 est. value
Lake Worth, FL 33460

Country Club Irrigation Improvements and Pump Station
Post-Bid
North Palm Beach, FL 33408

Rehabilitation of Pumps D-16 and D-18
Results
Less than $1,000,000 est. value
Palm Beach, FL 33401

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Lift Station No. 153
Results
Less than $400,000 est. value
West Palm Beach, FL 33411

Improvements to Master Repump Station 9-North WUD
Post-Bid
$3,200,000 est. value
West Palm Beach, FL

Lift Station Rehabilitation Continuing Construction Contract 2020 WUD
Term Contract
Results
Less than $7,200,000 est. value
West Palm Beach, FL 33416

Lift Station Rehabilitation Project - Bid Package 2
Results
Less than $5,960,000 est. value
FL

Lift Station 53 Improvements
Results
$350,000 to $500,000 est. value
West Palm Beach, FL 33407

Gumbo Limbo Nature Center Seawater Intake Replacement and Pump Station
Results
$3,100,000 est. value
Boca Raton, FL 33432

Woodlands Park Sewer Improvements
Results
Less than $300,000 est. value
Boca Raton, FL 33434

Last Updated 03/17/2021 10:06 AM
Project Title

Belle Glade Airport Lift Station Construction FDOT Joint Participation Agreement

Physical Address View project details and contacts
City, State (County) Belle Glade, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Furnish all labor and materials necessary to construct all improvements at the Belle Glade Airport Lift Station as depicted on the plans and in these specifications to provide a complete and functional system. 2. Contractor's Duties (Not all Inclusive. See General Conditions for Details): 1. Except as specifically noted, provide and pay for: 2. Mobilization and demobilization 3. Preconstruction video 4. Maintenance of Traffic (pedestrian and vehicular) 5. Project area dewatering 6. Labor, materials, and equipment 7. Tools, construction equipment, and fuel 8. Electric, water, and utilities required for construction 9. Freight and sales tax 10. Testing and laboratory services 11. Field engineering 12. Record Drawings in a format acceptable to the Engineer/CITY. Information will be used by the Engineer for Permit Certification Requirements. 13. Compliance with all of the conditions of the permits issued for this project. 14. Any other incidental labor, materials, and equipment required to construct the project. 15. Site restoration

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents