Similar Projects
UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
$5,368,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Development
Addition, Infrastructure
Design
$600,000 est. value
Gurnee, IL 60031

Bridges - St. Johns Avenue - City of Highland Park
New Construction, Infrastructure
Design
$490,000 CJ est. value
Highland Park, IL 60035

Lake Bluff Pump Station (PS-6) Sewage Storage Basin
Renovation, Infrastructure
Bidding
$9,800,000 CJ est. value
Lake Bluff, IL 60044

FY23 CONCRETE REPAIRS AT THE WAUKEGAN WATER RECLAMATION FACILITY
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Waukegan, IL 60085

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Hydrant Assemblies 2021-2022
Term Contract
Post-Bid
Waukegan, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

The Clove
New Construction, Infrastructure - 113,000 SF
Construction
$150,000,000 CJ est. value
Buffalo Grove, IL 60089

Heritage Woods Assisted Living
New Construction, Infrastructure - 123,723 SF
Pending Verification
$3,000,000 CJ est. value
Deerfield, IL 60015

Hawthorn Mall Phase II / Vernon Hills
New Construction, Infrastructure - 55,000 SF
Pending Verification
$101,000,000 CJ est. value
Vernon Hills, IL 60061

North Highway 45 Warehouse Distribution Building 2
New Construction, Infrastructure - 168,980 SF
Conception
$20,000,000 CJ est. value
Libertyville, IL 60048

Construction Services - Concrete Work
Term Contract
Design
$60,000 CJ est. value
Grayslake, IL 60030

Last Updated 10/12/2022 12:06 AM
Project Title

Deerpath Road Water Main Improvements

Physical Address View project details and contacts
City, State (County) Lake Forest, IL 60045   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Occupancy, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $1,160,106 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 24, 2022, a general contractor was awarded and construction is complete. *The closed solicitation has been included below for reference: Project Category Code: Water Transmission Pipelines, Sewer and Water Construction, Water Utilities Description: This project includes approximately 400 lineal feet of open cut water main replacement and appurtenances; 2,100 lineal feet of 12-inch I.D. water main installed by horizontal drilling; 20 water service replacements; 400 square yards of HMA pavement patching and replacement; 750 lineal feet of curb replacement; 5500 square feet of sidewalk replacement; 1250 square yards of seed lawn restoration, and other miscellaneous items of work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents