Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

SR 138 From I-75 to Rockdale County Line
Infrastructure
Design
$4,000,000 CJ est. value
Jonesboro, GA 30238

SR 138 From I-75 to Rockdale County Line
Infrastructure
Design
$4,000,000 CJ est. value
Jonesboro, GA 30238

Wooden Bridge Repair and Refurbishment
Infrastructure
Bidding
$200,000 CJ est. value
Morrow, GA 30260

Wooden Bridge Repair and Refurbishment
Infrastructure
Bidding
$200,000 CJ est. value
Morrow, GA 30260

Site Preparation and Restoration for Portable Classrooms and Miscellaneous Paving or Patching
Post-Bid
Atlanta, GA 30339

Annual Contract for Cased Roadway / Railroad Bores
Infrastructure
Post-Bid
GA

T32-D7-Pavepres-SR 139 0-3-111034
Results
GA

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 3 and 4
Results
Atlanta, Dahlonega, Dunwoody, Hampton, Irondale, Jonesboro, LaFayette, Riverdale, Roswell, GA 30525

SR 3 Conn at CR 392 / Upper Riverdale Road
Infrastructure
Design
Less than $1,000,000 est. value
Jonesboro, GA 30236

2022 LMIG Program
Infrastructure
Post-Bid
Stockbridge, GA

T32-D7-PCC-Various Locations
Results

CR 506 / Brown Road at Swamp Creek 1 Mi Sw of Jonesboro
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Jonesboro, GA 30238

Commercial Properties Re-Development
Infrastructure
Post-Bid
Morrow, GA 30260

2021 LMIG Project
Results
Mount Vernon, GA

Last Updated 08/05/2022 01:36 PM
Project Title

Forest Park Downtown Streetscape Phase 2A - Main Street

Physical Address View project details and contacts
City, State (County) Forest Park, GA 30297   (Clayton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,054,493 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the City's "Forest Park Downtown Streetscape Phase 2A - Main Street" project. The work consists of furnishing and installing all materials, labor, tools, equipment, and related services required for a complete project. This project includes but is not limited to providing the construction of a complete streetscape and roadway on Main Street in Forest Park Georgia. Question Acceptance Deadline 06/03/2022 05:00 PM EDT Questions are submitted online No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents