Similar Projects
Right of Way - SH076
Infrastructure
Conception
$1,250,000 CJ est. value
Blanchard, OK 73010

Right of Way - SH059
Infrastructure
Conception
$800,000 CJ est. value
Wayne, OK 73095

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain, Bridge and Surface - SH 24
Infrastructure
Design
$2,300,000 CJ est. value
Purcell, OK 73080

Interchange - I-35
Infrastructure
Bidding
$39,000,000 CJ est. value
Purcell, OK 73080

Reconstruct T-Hangars No. 8 & 9 and Construct Taxilanes
Infrastructure
Bidding
$2,400,000 CJ est. value
Goldsby, OK 73093

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Pennsylvania Avenue Bridge Water Line Relocation
Infrastructure
Results
$200,000 est. value
OK

Section Line Road Paving Improvements
Infrastructure
Results
$3,491,285 CJ est. value
Blanchard, OK 73010

Right of Way - IS035
Infrastructure
Conception
$500,000 CJ est. value
Purcell, OK 73080

Utilities - SH 76
Infrastructure
Design
$500,000 CJ est. value
Blanchard, OK 73010

Water System Improvements I-35 and Sh 9 Water Line Relocation
Infrastructure
Bidding
$600,000 CJ est. value
Goldsby, OK 73093

Starbucks #67888 / Purcell
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Purcell, OK 73080

Sanitary Sewer Improvements Tri-City Sewer Line Extension
Infrastructure
Results
$696,547 CJ est. value
Newcastle, OK 73065

Last Updated 07/06/2023 01:03 AM
Project Title

Water System Improvements-SH 76 Water Line Relocation

Physical Address View project details and contacts
City, State (County) Newcastle, OK 73065   (McClain County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,624,889 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For any and all inquires, please reach out to Glenn Sullivan & Associates Inc. via EMAIL ONLY - EM: planroom.gsa@gmail.com Disclaimer: Please note estimate comes from historical data and may not be an accurate reflection of the project's value. Project to include construction of approximately 6,600 l.f. of 6"-12" PVC water line and appurtenances (Base Bid). An alternate bid will be taken for upsizing all lines to 12" along with additional replacement. All work shall be performed, and all construction and material used and furnished shall be in accordance with the Contract Documents prepared by Glenn Sullivan & Associates, Inc., and on file in the office of the City Clerk, located at City Hall. The Notice to Bidders, Form of Bid, Form of Contract, Plans and Specifications, Forms of Bid Bond, Performance and Statutory Payment Bond, and other Contract Documents may be examined at the following: 1. City Hall 120 NE 2nd Street Newcastle, Oklahoma 73065 (405) 387-4427 Each bidder shall accompany his original bid, with a certified or Cashiers Check on a solvent bank located in Oklahoma or a Bidders Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said plans and specifications and furnish the required bonds within seven (7) days after the acceptance of his bid. The deposit will be retained by the Owner as, and for, liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. Each bidder shall accompany his bid with a sworn statement in writing that the Bidder has not directly or indirectly entered into an agreement, express of implied, with any other bidder or the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof. A Performance, Maintenance and Statutory Bond in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract, and the bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded to him. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner. All bids shall remain on file at least forty-eight (48) hours. Bids received more than ninety-six (96) hours prior to the Bid Opening will be returned. Contract to be awarded to low responsive responsible bidder. The Owner reserves the right to waive any informalities in the bidding and the right to reject any and all bids in accordance with the Oklahoma Competitive Bidding Act. Conditional bids shall not be accepted.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents