Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Construction Contracting Program
Renovation
Post-Bid
Saint Paul, MN

Historical Society - Gibbs Farm Master Plan Design Build
New Construction
Post-Bid
Falcon Heights, MN 55113

Restroom Remodeling at Retirement Services Building
Renovation
Results
Saint Paul, MN 55103

Best Value Waters Edge Office and HVAC Improvements
New Construction
Results
$5,700,000 est. value
Roseville, MN 55113

Metro Plant Solids Improvements and Services and Laboratory Buildings
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Saint Paul, MN 55101

Plato Sanitary Lift Station Rehabilitation
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Saint Paul, MN 55101

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Public Safety Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$11,100,000 CJ est. value
White Bear Lake, MN 55110

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

USPS IQ JOC Minnesota
Renovation
Results

Metro Square Escalator Replacement Project
Renovation
Results
Saint Paul, MN 55101

Last Updated 10/05/2022 03:08 AM
Project Title

BCA Building Roof Replacement

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55106   (Ramsey County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,497,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Remove the existing built-up roof and install a new gravel surfaced built-up roof. 2. Remove and reinstall existing lightning protection. Responding company has completed as a Prime Contractor, not as a subcontractor, the work for at least three (3) contracts which have achieved Substantial Completion since April 1, 2018 for construction of a gravel surfaced built-up roof on a public facility. All questions should be submitted to Ryan Normandin at Ryan.Normandin@state.mn.us, 651-201-2451 no later than 4:00 PM CT, September 28, 2022. The State is not obligated to answer questions submitted after the question due date and time. Est. Completion Date: Aug. 31, 2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents