Similar Projects
Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Orange Technical College Winter Park Campus Replacement Project
New Construction, Renovation, Infrastructure
Design
$40,000,000 CJ est. value
Winter Park, FL 32789

Lake Copeland Apartments
New Construction, Infrastructure - 13,200 SF
Design
$13,000,000 CJ est. value
Orlando, FL 32806

Majewski Airplane Hangar
New Construction - 12,387 SF
Post-Bid
Apopka, FL 32712

Christian Brothers Automotive / Ocoee - Rebid
New Construction, Infrastructure - 4,561 SF
Post-Bid
$1,200,000 CJ est. value
Ocoee, FL 34761

Easterly Wetlands Boardwalk
Results
$1,000,000 est. value
Orlando, FL 32802

University Boulevard at Rouse Road Intersection Improvements
Results
$1,381,618 est. value
Orlando, FL 32800

Floridian Town Center
New Construction, Infrastructure - 290,000 SF
Construction
$500,000,000 CJ est. value
Apopka, FL 32712

Floridian Town Center
New Construction, Infrastructure - 290,000 SF
Construction
$500,000,000 CJ est. value
Apopka, FL 32712

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

Lake Underhill Road Widening Segment 3 - Orange County
Infrastructure
Conception
$5,000,000 est. value
Orlando, FL 32885

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Big Dan's Car Wash - Orange Blossom Trail / Orlando - Rebid
New Construction, Infrastructure - 5,010 SF
Post-Bid
$1,500,000 CJ est. value
Orlando, FL 32809

Last Updated 05/23/2023 05:10 PM
Project Title

RFQ - D/B Terminal C Multi-modal Connector Pedestrian Bridge and Rental Car Lobby

Physical Address View project details and contacts
City, State (County) Orlando, FL 32827   (Orange County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Greater Orlando Aviation Authority (the Authority), notice is hereby given that design/build firms (Proposers) are invited to submit Statements of Qualifications for the design and construction of BP-S00198, Terminal C Multi-Modal Connector Pedestrian Bridge & Rental Car Lobby (Design/Build) (the Project) at the Orlando International Airport (the Airport) This Project will complete the construction of approximately 450 ft. of an elevated, enclosed and conditioned pedestrian walkway and adjacent rental car lobby area on the north side of the pedestrian walkway that will directly connect the new Terminal C with the existing multi-modal facility that will serve up to four forms of passenger rail and all forms of public and private ground transportation. The Project must comply with the Americans with Disabilities Act, provide accessibility for all individuals, include four moving walkways, and elevators, escalators and stairs to navigate between the two facilities. The Project includes rental car counters and queuing areas, multi-use information displays, interior landscaping, and preservation of all future capabilities for baggage right-of-ways and connection to future facilities and parking facilities. The Project services include all design and construction required for a fully functioning facility consistent with the Design Criteria Package, including, but are not limited to, preparation of design documents, architectural design, environmental, structural, mechanical and electrical engineering design, security and systems design, surveying, permitting, evaluation and documentation of existing conditions, verification of as-built conditions, cost estimating and scheduling, construction, quality control, testing, commissioning, turnover to operations and all other services necessary for a fully functioning facility, including coordination with the Authority, its Consultants, the City of Orlando and all agencies having jurisdiction over the Project. The Project Scope, the Submission Requirements, Disadvantage Business Enterprise (DBE) Participation Program and questions regarding the Project will be reviewed at the Pre-Submittal Conference. Proposers are hereby notified that compliance with federal grant requirements may be required, including, but not limited to, the following: (1) the Disadvantaged Business Enterprise (DBE) requirements of 49 CFR Part 26, and the Aviation Authoritys Disadvantaged Business Enterprise Participation Program; (2) the Buy American requirements imposed by Section 9129 of the Aviation Safety and Capacity Expansion Act of 1990; (3) the minimum prevailing wage rates established by the Secretary of the U.S. Department of Labor (Davis Bacon), for all construction services as defined by the federal government; (4) Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246), as amended, requiring an Equal Opportunity Report Statement; (5) Certification Regarding Lobbying Pursuant to 49 CFR Part 20 for Contracts, Grants, Loans, and Cooperative Agreements; 6) Certification Regarding Debarment, Suspension, Ineligibility And Voluntary Exclusion (2 CFR Part 1200,2 CFR Part 180, and the Aviation Authoritys Policy Section 130.04; 7) the Standard Title VI Assurances and Nondiscrimination Provisions; 8) the Foreign Trade Restriction Certification (49 USC 50104 and 49 CFR part 30); and, 9) the procurement of recovered materials pursuant to the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, and the regulatory provisions of 40 CFR Part 247. Timetables: Goals for minority participation for each trade: 15.5% Goals for female participation in each trade: 6.9% The DBE Participation Goal for this contract is 25%. The procurement Committee is scheduled to meet on May 31, 2023 to interview the shortlisted firms. The award of the contract is subject to approval by the Aviation Authority prior to any work or services being performed Shortlist Confirmed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents