Similar Projects
Contract for the Purchase of a Submersible Pump
Post-Bid
San Antonio, TX

CID 05 - 2020 Ground Storage Tanks - E
Post-Bid
$724,000 est. value
Elmendorf, TX 78112

Saws Water Well Mitigation Program
Results
Less than $97,000 est. value
San Antonio, TX

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

CID 04 - 2020 Composite Elevated Storage Tank - D
Post-Bid
$1,065,000 est. value
Elmendorf, TX 78112

La Rosa Pump Station Rehabilitation Project
Results
Less than $10,107,000 est. value
San Antonio, TX 78211

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

NACO Ground Storage Tank Rehabilitation Project
Results
Less than $1,884,210 est. value
San Antonio, TX 78233

Peppermint Elevated Storage Tank Rehabilitation
Post-Bid
Less than $486,000 est. value
Kirby, TX 78219

Annual Contract for Maintenance and Servicing of Deep Injection Well Valves and Heads
Results
San Antonio, TX 78212

2020 Water Production Storage Tank Facilities Project
Post-Bid
San Antonio, TX 78212

Annual Contract for Hydromatic Parts and Service
Results
San Antonio, TX 78200

Construct Elevated Storage Tank with Alternant Bid, Replace Booster Station and Ground Storage Tank at the Michael Unit
Post-Bid
San Antonio, TX 78200

Grass Hill Elevated Storage Tank Painting and Rehabilitation
Results
$326,000 est. value
Leon Valley, TX 78238

Annual Contract for Wastewater Submersible Pump Unit Repair Services
Post-Bid
San Antonio, TX 78212

Reported 08/28/2020 12:00 AM
Project Title

Elmendorf Water Supply Project

Physical Address View project details and contacts
City, State (County) Elmendorf, TX 78112   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of three wells, ground tanks, RO Treatment Plant, High Service Pump Station and Elevated Storage Tank.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents