Similar Projects
Indoor Soccer Facility
New Construction - 10,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lawrenceville, GA 30044

Renovations to Old Hickory Flat Gymnasium
Renovation - 9,663 SF
Bidding
Canton, GA 30115

Construction of Grant Center Gymnasium
New Construction
Bidding
Savannah, GA

School Facility Maintenance
Post-Bid
Decatur, GA 30032

Loganville High School Locker Room Building
New Construction - 1,728 SF
Post-Bid
Less than $750,000 est. value
Loganville, GA 30052

WJMS, SEBMS, and LCMS New Athletic Complexes
Results
Statesboro, GA 30458

Tennis Centers - Management, and Maintenance and Capital Improvement
Results
Atlanta, GA 30303

Athletic Field
New Construction
Construction
Augusta, GA

Philadelphia Romanian Church
Addition - 14,285 SF
Construction
Lawrenceville, GA 30045

Walton High School Athletic Complex
Renovation
Bidding
$3,099,135 est. value
Marietta, GA 30062

New Construction of Villa Rica High School Football Stadium
New Construction
Post-Bid
Less than $6,800,000 est. value
Villa Rica, GA 30180

Recreation Gymnasium Renovation
Results
Less than $60,991 est. value
Leesburg, GA 31763

Wesleyan School
New Construction - 8,582 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Peachtree Corners, GA 30092

Sprayberry High School New Gym and CTAE Interior Renovations
Renovation
Bidding
$18,498,939 est. value
Marietta, GA 30066

Athletic Field Maintenance
Post-Bid
Winder, GA 30680

Reported 07/31/2021 12:00 AM
Project Title

Athletics Indoor Practice Facility

Physical Address View project details and contacts
City, State (County) Statesboro, GA   (Bulloch County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $10,500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A new indoor practice facility for athletics department. The building will be a metal frame building on a concrete foundation with roof, restrooms, storage, and adjacent tailgating space. The building will be open-air with a turf field of play. The proposed new indoor practice facility is anticipated to be approximately 100,000 sf and located near Paulson Stadium to facilitate ease of access to the existing Football Operations Center. The project anticipates space for various sports, including a netting system for separation of certain areas of the field of play. A metal frame building on a concrete foundation with roof is proposed, with restrooms, storage and adjacent tailgating spaces. The building will be open-airwith a turf field of play

Details

Athletic Facility, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents