Similar Projects
Pace Dempster Street Pulse Stations
New Construction
Bidding
$15,000,000 est. value
Chicago, IL

Weigh in Motion Repair and Maintenance
New Construction, Term Contract
Bidding

Industrial Park Building Expansion and Renovation
Renovation
Post-Bid
Murphysboro, IL 62966

Kankakee Metro Centre Bus Transfer Station
New Construction
Post-Bid
Kankakee, IL 60901

Vehicle Maintenance Building
- 13,800 SF
Results
Orland Park, IL 60467

Congress Park Metra Station Area Rehab
Results
Brookfield, IL 60513

Landscape Planting Improvements
Term Contract
Post-Bid
IL

Transportation Building
Renovation
Results
Less than $3,500,000 est. value
Skokie, IL 60077

Replace Guard House HVAC; Replace Canopy and Walkway; and Modernize Stormwater Drainage
Post-Bid
Aurora, IL

Weigh Station Repairs
Results
Wadsworth, IL 60083

North Chicago METRA Station
Renovation
Results
North Chicago, IL 60064

Maintenance Facility - Design-Build RFP - Phase I
New Construction
Results
Less than $15,000,000 est. value
McCook, IL 60525

New Administration Facility
New Construction - 5,013 SF
Results
Harrisburg, IL 62946

Upgrading Compressed Gas Storage Cages
New Construction
Results
Chicago, IL 60616

Reported 04/15/2021 12:00 AM
Project Title

Abraham Lincoln Capital Airport - 183 CES Repair CRF Building P-17

Physical Address View project details and contacts
City, State (County) Springfield, IL 62707   (Sangamon County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2021, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work: The project, 183 CES Repair Centralized Repair Facility (CRF) Building P-17 will create adequate space to perform Aerospace Ground Equipment (AGE) work, metal fabrication and welding, as well as other back shop maintenance functions. Work will include, interior and exterior work as shown in the project documents that will be included in the solicitation. Renovation of the building will include: Interior walls will be reconfigured and electrical, plumbing, fire protection, communications and HVAC systems will be upgraded to accommodate equipment and space functions. The high-bay, north, and east lean-to slabs-on-grade will be replaced to accommodate a level floor for equipment. Latrines will be remodeled. Roof and wall cladding will be replaced/upgraded to meet Anti-Terrorism/Force Protection criteria. Site drainage improvements will also be completed to prevent water from standing adjacent to the building. Completion of this objective should result in an adequately sized and properly configured, co-located AGE, Sheet Metals Shop and Metal Tech facility suitable to equipment space needs and the operational requirements of the “back shop” maintenance activities.

Details

Misc. Structures, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents