Similar Projects
Sanitary Collection System Improvements, Phase 2A, Water Distribution System Improvements, Phase 1A
Infrastructure
Bidding
$8,000,000 est. value
Arcadia, FL

Water Well Line Replacement
Alteration
Bidding
Hurlburt Field, FL 32544

Advanced Metering Infrastructure Program
Post-Bid
Clewiston, FL 33440

Underground Construction Contractor Transmission Water Mains
Post-Bid
Key West, FL

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Sitework and Utility Installation
Results
Sarasota, FL

Eldridge Avenue Water Main Replacement Project
Infrastructure
Bidding
Orange Park, FL 32073

Pre-Qualification of Vendors Ductile Iron-Pipe and Fittings
Term Contract
Post-Bid
West Palm Beach, FL

Green Meadows Water Main Replacement
Results
Less than $250,000 est. value
Belleview, FL

Underground Utility Location Services
Term Contract, Infrastructure
Bidding
$28,050 est. value
Pembroke Park, FL

Furnish and Install 16-Inch Pvc 14-Inch HDPE ForceMain at N.E. 183Rd Road Street & Island Blvd
Post-Bid
$3,667,495 est. value
FL

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

FY2021 Valve Replacement Program
Infrastructure
Bidding
Sarasota, FL

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

Construction Manager (CM) for Town Wide Overhead Utility Under Grounding Program - Phase Five, North and South
Results
West Palm Beach, FL 33401

Reported 03/25/2022 12:00 AM
Project Title

Sumter County Jail Water Management System Replacement Project - Bravo Building

Physical Address View project details and contacts
City, State (County) Bushnell, FL 33513   (Sumter County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes: 1. Demolition and disposal of the existing water management system. 2. Installation of the ICON brand water management system including fixture manifolds, water closet flush valves, control panels, low voltage wiring and AC power to existing outlets. 3. ICON representative to provide a pre-install walk-through and start-up and training when installation is complete. 4. Approximately 8 cells, one isolated shower. 5. All cells will be vacated. 6. There is facility access with no restrictions, no tool checks, no sign-in / sign-out, escort will be arranged. 7. There are convenient and operable valves for isolation for independent cells or blocks of cells. 8. There are electrical outlets for power

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents