Similar Projects
Pump Station 218 Improvements - Tuthill
Results
$1,850,000 est. value
Sioux Falls, SD 57105

Lake Norden Main Lift Station Improvements
Results
$575,000 to $600,000 est. value
Lake Norden, SD 57248

Pump Station 240 Capacity Improvements
Post-Bid
Less than $5,687,511 est. value
Sioux Falls, SD 57110

Creek Lift Station and Force Main
New Construction
Post-Bid
SD

Mitchell Dailey Drive Lift Station
Results
$1,284,738 est. value
Mitchell, SD 57301

Wastewater System Improvements
Results
Delmont, SD

MCWC EROS Control Valve Station
New Construction
Post-Bid
Dell Rapids, SD

West Lift Station
New Construction
Results
$330,000 est. value
Elkton, SD

Lift Station and Forcemain Installation
New Construction, Infrastructure
Post-Bid
$515,000 est. value
Hudson, SD

East Farmer Avenue Lift Station Replacement
New Construction
Post-Bid
$300,000 est. value
Howard, SD 57349

Harrisburg Pooling Point
New Construction - 80 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Worthing, SD

Pump Station 203 Improvements
Post-Bid
$2,150,000 est. value
Sioux Falls, SD

Meter Buildings
Renovation
Results
$1,800,000 to $2,250,000 est. value
Hull, Sioux Center, IA - Beresford, SD

Last Updated 06/21/2021 09:20 AM
Project Title

Sturgis I-90 Crossing and Booster Station

Physical Address View project details and contacts
City, State (County) Sturgis, SD   (Meade County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,162,126 to $2,883,016
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of 4,579 linear feet of 12” PVC C-900 DR 18 or 16” HDPE DR 9 water main, 30 linear feet of 8” PVC C-900 DR 18 water main, a prefabricated booster station, 833 linear feet of 15” SDR 35 sewer main, 3 manholes, 2 under highway bores, and associated valves and fittings. The work shall also include: 1. Preparation of shop drawings. 2. Operation and maintenance manuals. 3. Field testing.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents