Similar Projects
RFP Engineering - 2023 Standard Specifications Update
Infrastructure
Bidding
$25,000 CJ est. value
Casper, WY 82601

RFQ - Conduct Traffic Studies For Site Plans and Subdivision Developments
Term Contract
Bidding
Casper, WY 82601

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Professional Design Services
Renovation, Infrastructure
Post-Bid
Casper, WY 82601

Design Construction Services
New Construction, Infrastructure
Post-Bid
Casper, WY 82601

Professional Engineering for Diabase, Sage, and Weiss Campground Improvements
Term Contract
Post-Bid
WY

Professional Engineering Services for Beartrap Shelters Casper Mountain
Infrastructure
Post-Bid
Casper, WY 82601

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Professional Engineering Services for Herbst Gravel Pit
Infrastructure
Post-Bid
Mills, WY

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Garden Creek Trail Loop Connectivity Plan
Infrastructure
Post-Bid
Casper, WY

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Last Updated 09/30/2022 07:06 AM
Project Title

RFP - Irrigation Controller System Procurment

Physical Address View project details and contacts
City, State (County) Casper, WY 82601   (Natrona County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Casper's irrigation systems are in need of a new irrigation control system that will operate more efficiently to reduce the amount of water used. The system shall include all necessary equipment and programing needed to automate and improve the irrigation system. The City of Casper reserves the right to reject any or all submissions, and to waive informalities and minor irregularities in submissions received, and to accept any portion of a proposal or all items if deemed in the best interest of the City of Casper. The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents