Similar Projects
23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Bidding

Sand Mountain Road Paving
Infrastructure
Bidding
$100,000 to $500,000 est. value
PA

College Avenue and Heister Street Sidewalk and Utility Upgrades
Renovation
Post-Bid
$662,219 est. value
University Park, PA 16802

2021 Roadway Improvements - Beaver Avenue (SR 0026) & Locust Lane Improvements
Post-Bid
$45,000 est. value
State College, PA 16801

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Lyonstown Road Roadway Base Repairs
Results
Bellefonte, PA

Atherton Street High Pressure Steam Crossing
Alteration
Bidding
University Park, PA

Compost Facility Access Drive Paving Overlay Project
Post-Bid
State College, PA 16801

Milling of Bituminous Paving
Results
Aaronsburg, PA 16820

T-487 0.14 Miles
Post-Bid
Howard, PA

Mountain Road Paving Project
Results
Boalsburg, PA 16827

Milling of Bituminous Paving Notch
Post-Bid
Snow Shoe, PA

Bituminous Seal Coat
Results
Aaronsburg, PA 16820

2021 Roadway Improvements - O'Bryan Lane and Oneida Street Type I Reconstruction/Restoration
Post-Bid
$2,000,000 est. value
State College, PA 16801

Roadway Widening
Results
Bellefonte, PA 16823

Reported 03/12/2022 12:00 AM
Project Title

Pike Street Traffic Calming and Accessibility Project

Physical Address View project details and contacts
City, State (County) Lemont, PA   (Centre County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract includes: Construction of traffic calming and pedestrian accessibility improvements along a three-block section of Pike Street, a Township road, from Elmwood Street to Dale Street including erosion & sedimentation control, full depth roadway reconstruction, curb, sidewalk replacement, stormwater inlets and pipes, bus stops and street tree replacement. Work will include installation of Maintenance and Protection of Traffic controls through the work area and establishment of a detour route.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents