Similar Projects
Lincoln South of Public Sewer Project
Infrastructure
Bidding
$400,000 CJ est. value
Nora, ID 83871

Lincoln South of Public Sewer Project
Infrastructure
Bidding
$400,000 CJ est. value
Nora, ID 83871

Lilly Street Reconstruction a Street to Third Street
Alteration
Post-Bid
Moscow, ID

Kendrick High School Concessions and Locker Room
Renovation, Addition, Alteration
Post-Bid
Kendrick, ID

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Idaho Community Development Block Grant
New Construction, Infrastructure
Results
$175,174 est. value
Moscow, ID 83843

Asphalt for Chip Seal Operation
Infrastructure
Post-Bid
Moscow, ID

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

Street Repairs
Infrastructure
Post-Bid
$300,000 est. value
Troy, ID 83871

Thorn Creek Road to Moscow PH 1
Infrastructure
Results
$25,000,000 est. value
ID

RFQ Construction Manager - Meat Science and Innovation Center, Vandal Brand Meats
New Construction, Infrastructure - 12,700 SF
Post-Bid
$7,650,000 CJ est. value
Moscow, ID 83844

Sixth Street Pedestrian Improvements
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

Widen the Roadway to a Two-lane Urban Road With Bicycle Lanes, Turn Lanes, Storm Drainage Improvements
Infrastructure
Results
ID

Moscow North and Moscow Alt Route
Infrastructure
Results

Cold Milling, Smoothness Milling, Crack Filling Placement of Plant Mix Pavement, Guardrail and Sign Update Between MP 23.60 and MP 29.00 on SH-3
Infrastructure
Results
ID

Last Updated 01/11/2023 08:37 AM
Project Title

Lilly Street Reconstruction 'A' St. to Third St. - Rebid

Physical Address View project details and contacts
City, State (County) Moscow, ID 83843   (Latah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,871,407 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Box Culvert, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Storm Drain and Paving, Street/Roadway Reconstruction , ADA Curb Ramps, Pavement Resurface and Rehabilitation, Excavation, Waterlines This project's base bid includes the reconstruction of Lilly Street, from State Highway 8 to 'A' Street. The reconstruction work includes full depth street pavement replacement, sidewalk replacement, waterline replacement, storm sewer replacement, and sanitary sewer replacement within the street. Pedestrian curb ramps at intersections will also be replaced as needed to be in compliance with ADA requirements. The base bid also includes the realignment of Hog Creek, including replacement of a box culvert under Lilly Street, block wingwalls, excavation of a new creek channel, block wall, precast elbow, twin 54" culverts and precast headwall. This project's add alternate includes the reconstruction of First Street, from Lieuallen Street to Lilly Street. The reconstruction work includes full depth street pavement replacement, sidewalk replacement, installation of new waterline, and new stormwater facilities. Est. Value Notes: $1.7M - $2.0M Est. Completion Date: Aug. 26, 2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents