Similar Projects
Tractor and Loader With a Moldboard Plow - Keenesburg
Alteration
Bidding
Colorado Springs, CO

Sep Horizon High Steel
Alteration
Bidding
CO

Audio/Visual Equipment
Post-Bid
Fort Carson, CO 80913

USAFA/AD Blue/Silver Lounge Audio Visual
Post-Bid
Colorado Springs, CO 80840

Rebuild/Replace Pool Supply Fan/Humidifier, Peterson AFB
Results
Colorado Springs, CO 80914

Kubota Utility Tractor M6060HD
Results
Colorado Springs, CO

Walk-In Cooler/Freezer Combo Units
Post-Bid
Colorado Springs, CO 80910

Fuel Gas Knockout Tank and Equipment
Alteration
Results
CO

Evidence Freezer
Post-Bid
Colorado Springs, CO

Reach-in Refrigerators
Term Contract
Post-Bid
Colorado Springs, CO 80910

CTCF Kitchen Walk-in Cooler-Freezer Install
Post-Bid
Less than $70,000 est. value
Colorado Springs, CO 80910

Touch Free Restroom Fixture Equipment Purchase Only
Post-Bid
Colorado Springs, CO

Bus Lift Replacements
Post-Bid
Colorado Springs, CO

Northwestern Division Crane MATOC
Post-Bid
$1,000,000 to $25,000,000 est. value

Washers & Dryers
Post-Bid

Reported 09/28/2021 12:00 AM
Project Title

Cmsfs Replace Existing Hoist In Main Exhaust Shaft

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall replace existing hoist located in main exhaust shaft with 5 ton 208 volt steel wire rope type with 140 foot of lift, hoist trolley will need to fit a 7 in wide mono beam and be of power drive with radio control (recommended product R&M SX502). Additionally, Contractor will install a tag line with rollers to support and secure the power supply to monorail beam. Contractor will verify power and beam width requirements before ordering unit, complete an operational test and load test to industry standard and provide certification upon completion of project.

Details

Division 01 - General Requirements, Construction Aids, Temporary Hoists.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents