Similar Projects
Quick Quack Car Wash
New Construction - 3,272 SF
Conception
$1,400,000 est. value
Pharr, TX 78577

Quick Quack Car Wash
New Construction - 4,000 SF
Conception
$1,400,000 est. value
McAllen, TX

Convenience Store
New Construction - 4,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Austin, TX 78754

Convenience Store
New Construction - 4,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Austin, TX 78728

Whitewater Car Wash
New Construction - 4,078 SF
Bidding
$1,600,000 est. value
Galveston, TX 77551

Burleson Nissan
New Construction, Addition
Bidding
$1,000,000 est. value
Burleson, TX 76028

7-Eleven #36259
New Construction - 4,872 SF
Sub-Bidding
$800,000 est. value
Bulverde, TX 78163

Re Fuel #317
Renovation - 3,471 SF
Sub-Bidding
$800,000 est. value
Austin, TX 78746

Breeze Thru Express Car Wash
New Construction - 6,000 SF
Post-Bid
$1,500,000 est. value
Round Rock, TX 78681

JBSA Lackland Car Wash Repair (NAF)
Renovation
Post-Bid
San Antonio, TX 78236

Bus Wash
Results
Jacksonville, TX 75766

Contract to Replace the Bus Wash System
New Construction
Results
Beaumont, TX 77701

Blue Beacon Truck Wash
New Construction - 15,500 SF
Construction
$2,000,000 est. value
Weatherford, TX 76086

Garland Express Car Wash
New Construction - 5,500 SF
Construction
$1,500,000 est. value
Garland, TX 75044

Kent Kwik 326
New Construction - 6,238 SF
Pending Verification
$4,000,000 est. value
Midland, TX 79701

Reported 06/21/2022 12:54 PM
Project Title

Tesla Westchase Hvac

Physical Address View project details and contacts
City, State (County) Houston, TX 77063   (Harris County)
Category(s) Commercial
Sub-Category(s) Car Wash
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected July 2022, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans consist of minor interior wall, door, and electrical revisions. Additions of 2-post vehicle lifts, and HVAC mechanical units to serve the existing office space. As of June 17, 2022, plans have not yet been submitted to the city building department for permitting. Construction is anticipated to begin around late July 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Car Wash, 26,558 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents