Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Main Street Reconstruction - City of Cedar Falls
Infrastructure
Design
$12,025,000 est. value
Cedar Falls, IA 50613

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

2021 Seal Coat
Infrastructure
Results
$143,728 est. value
Cedar Falls, IA

Black Hawk Co George Wyth Trail Repair
Infrastructure
Results
IA

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Industrial Park Expansion (Phase I) - 5 - City of Cedar Falls
Alteration
Conception
$6,000,000 est. value
Cedar Falls, IA 50613

Cedar River Safety and Recreational River lmprovements Phase I - City of Cedar Falls
Infrastructure
Design
$4,831,000 est. value
Cedar Falls, IA

FY 2022 Asphalt Overlay Program
Infrastructure
Post-Bid
Waterloo, IA

HMA Resurfacing - I-380
Infrastructure
Results
IA

Aikey Auto Salvage Storage Building
New Construction, Infrastructure - 5,200 SF
Pending Verification
$560,000 CJ est. value
Waterloo, IA 50703

Last Updated 03/13/2023 03:36 PM
Project Title

Oak Park BLVD Sewer Replacement Project

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA 50613   (Black Hawk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $545,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work under the proposed contract shall commence within ten (10) calendar days after the date set forth in the written Notice to Proceed and shall be performed regularly and diligently throughout the duration of the project. All work shall be completed within One Hundred Twenty (120) working days. Working days will be accumulated concurrently from the date set forth in the written Notice to Proceed. Each Form of Proposal shall be accompanied in a separate envelope by a bid security as defined in the Instructions to Bidders- Division 1 Section 05. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state orforeign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is aresident. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. Contractors and approved subcontractors will be provided a Sales Tax Exemption Certification to purchase building materials, supplies or equipment to be used in the performance of this project. Products utilized in the construction of this project shall be exempt from tax as provided by Code of Iowa Sections 423.2 and 423.45. The project involves the installation of a lift station on Minnetonka Dr in Cedar Falls, IA, installation of 498 LF of force main, 166 LF of gravity sewer, and 66 LF of water main. The project also includes replacement of storm sewer and subdrain, PCC pavement and sidewalks, landscaping, electrical work, erosion control, seeding, and other miscellaneous items required to complete the work. The City of Cedar Falls reserves the right to reject any and all proposals including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents