Similar Projects
Construct New South Ramp Hangar with Crew Quarters
New Construction, Infrastructure
Bidding
Eau Claire, WI 54703

Wexford Pond Flood Mitigation
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Madison, WI 53715

Monona Terrace Exterior Caulking Replacement
Alteration
Post-Bid
Madison, WI 53703

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Building Envelope Rehabilitation - Tommy G. Thompson Center Department of Administration
Alteration
Results
$2,649,000 est. value
Madison, WI 53703

Vestibule Replacement
Alteration
Results
Appleton, WI

Building Envelope Project Waukesha Airport Terminal and Tower Buildings
Alteration
Post-Bid
Waukesha, WI 53188

Roof and Envelope Repair, Mcgraw Hall
Alteration
Results
$240,000 est. value
Whitewater, WI 53190

Prefabricated Balconies and Decorative Railings (Commodity Only) for Building 3.1
Alteration
Post-Bid
Milwaukee, WI

Exterior Entrance Repair -MEP
Alteration
Results
$1,625,000 est. value
Whitewater, WI 53190

Outdoor Patio
Alteration
Post-Bid
Wyocena, WI 53969

Exterior Entrance Repair - GPC
Alteration
Results
$1,625,000 est. value
Whitewater, WI 53190

Government Center - Footings and Foundation Bid Package 1
Infrastructure, Alteration
Post-Bid
Wautoma, WI 54982

Tuckpoint Brick
Alteration
Results
Milwaukee, WI 53202

Exterior Building Repairs
Alteration
Post-Bid
Milwaukee, WI 53216

Last Updated 04/16/2023 04:02 AM
Project Title

Sanitary Lateral Replacement

Physical Address View project details and contacts
City, State (County) Whitewater, WI 53190   (Walworth County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $103,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of the replacement of the 10 and 6 sanitary sewer that serves the Anderson 37 library first and second additions. The existing clay tile line would be replaced with a new PVC sanitary sewer 38 service with manholes for access to maintain and clean the line. The lateral would be relocated to avoid extensive 39 disruptions to Main Street, existing crosswalks, trees and a sidewalk staircase. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. DFD reserves the right to reject bids submitted electronically if a bidder uses a remote online notarization technology provider that has not been approved by DFI.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents