Similar Projects
Central Station Alarm Monitoring (CSAM)
Post-Bid

N--DAS maintenance
Post-Bid

Physical Security/Access Control Systems (PS/AC) Multiple Award Construction Contract (MACC)
Results
Less than $99,000,000 est. value

RFI - Home Intrusion Detection Systems
Results

Request For Information - Command Post Console Installation
Post-Bid

Telecommunications Infrastructure Testing Services - Worldwide
Results

Security Cameras for BTU Distribution Service Center
Alteration
Post-Bid
Bryan, TX 77801

Residential Intrusion Detection Alarm System
Results

Access Control For BTU Distribution Service Center
Alteration
Post-Bid
Bryan, TX 77801

Custom Fiber Optic Mooring Cable
Results
Less than $506,301 est. value
College Station, TX

Nationwide Alarm Maintenance and Monitoring #3
Term Contract
Post-Bid

Bryan Isd Voip/Ippa Upgrade
Results
$2,250,000 est. value
Bryan, TX 77808

High Speed Camera
Alteration
Post-Bid
$100,000 est. value
College Station, TX

AV Equipment and Installation for Classroom 504
Results
$62,150 est. value
College Station, TX 77845

Purchase of Fiber Optic Cable
Alteration
Post-Bid
College Station, TX 77842

Last Updated 08/09/2022 09:34 AM
Project Title

Courthouse Security Enhancement

Physical Address View project details and contacts
City, State (County) Bryan, TX 77803   (Brazos County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Capitol/Court House/City Hall, Security/Communications
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project no- 3210112, D21-2508.00, 61099 Question Cuttoff Date & Time 7/26/2022 06:00:00 PM (ET) Renovation and addition to the secure entry at the Brazos County Courthouse. Renovation of approximately 500 GSF of the existing facility and an addition of approximately 150 GSF. The building will be occupied throughout the duration of the project. The scope of work includes, but is not limited to: concrete floor system, steel joints and deck, membrane roofing, applied fireproofing, aluminum entrances and storefronts, security storefronts, heating-ventilation-air conditioning, electrical systems, and lighting.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents