Last Updated | 08/12/2022 06:02 PM |
Project Title | W.J. Hooper WPP and Terry R. Hicks WPP - UV System Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Stockbridge, GA 30281 (Henry County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,497,508 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All questions related to the Project shall be submitted by email no later than 10:00 a.m., local time, on Tuesday, July 19, 2022, to Calvin Woolson at Calvin.Woolson@jacobs.com. Questions, if answered, will be addressed by Addenda to the Contract Documents via email and/or Jacobs File Transfer Tool. Owner shall make an award, if an award is made, to the lowest responsible responsive Bidder. The successful Bidder will be required to furnish the additional Bonds and Insurance prescribed in the Contract Documents. Owner's right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents. The Project includes, but is not limited to, the following upgrades: 1. W.J. Hooper Water Production Plant: a. Demolition of existing UV disinfection system inside existing UV Building. The items to be demolished and/or salvaged consist of: i. Four UV reactors and associated control panels. ii. Piping, valves and structural supports. iii. Chemical Cleaning system tank and containment wall. iv. Metal stairs and access platforms. v. Miscellaneous instruments. b. New UV Disinfection System: i. Two new UV reactors and associated control panels. ii. Concrete and metal stairs and platforms. iii. New Fiber Optic line within existing duct banks. iv. Various piping, valves, and structural supports associated with the work above. 2. Terry R. Hicks Water Production Plant: a. Demolition of existing UV disinfection system inside existing UV Building. The items to be demolished and/or salvaged consist of: i. Four UV reactors and associated control panels. ii. Piping, valves and structural supports. iii. Chemical Cleaning system tank and containment wall. iv. Metal stairs and access platforms. v. Miscellaneous instruments. b. New UV Disinfection System consisting of: i. Two new UV reactors and associated control panels. ii. Concrete and metal stairs and platforms. iii. Removal and reinstallation of existing metal platforms. iv. New Fiber Optic line within existing duct banks. v. Various piping, valves, and structural supports associated with the work above. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |