Similar Projects
Construct Storm Water Treatment Devices and Imported Borrow
Infrastructure
Bidding
$4,900,000 est. value
CA

Realign Roadway, Construct Roundabout and Relocate Sewer Lines
Infrastructure
Bidding
$4,220,000 est. value
CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Valencia School Road PM 0.35 - Storm Damage Repair Project
Infrastructure
Bidding
Aptos, CA 95003

PW Various Locations Pavement Renovation No 45 and Sewer Replacement
Infrastructure, Alteration
Post-Bid
$6,300,000 est. value
San Francisco, CA 94103

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Paper Mill Creek Storm Drain Inlet Upgrades Phase One
Infrastructure
Bidding
$176,400 est. value
Novato, CA 94949

Wastewater, Water, And Landfill Systems Consulting Services
Infrastructure
Post-Bid
CA

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Valencia Road PM 0.34 Storm Damage Repair
Infrastructure
Bidding
$745,219 est. value
Santa Cruz, CA

Operation and Maintenance Services of Sewer and Water Systems in County Service Area (Csa) R-1967-1 Castlewood
Alteration
Post-Bid
CA

Storm Water Pump Repair Services In San Mateo and Santa Clara Counties
Term Contract
Results

Reported 12/08/2021 12:00 AM
Project Title

Shoemaker Avenue Trunk Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Norwalk, Santa Fe Springs, CA 90659   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $750,000 to $1,250,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The work consists of the rehabilitation of approximately 4,417 feet of existing 12- and 15-inch diameter non-reinforced concrete pipe (NRCP) with cured-in-place pipe liners and twenty (20) manholes with a protective coating system, and all appurtenant work. Additional Description: The Board of Directors may award the contract for the above described work, either at the meeting of the Board of Directors to be held at the above-stated address, on January 26, 2022 beginning at 1:30 p.m., or at any other meeting of the Board of Directors within 120 days after the date listed above for receipt of bids. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 160 WORKING DAYS after the date in the Notice to Proceed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents