Similar Projects
Pinnacle Montessori Academy
New Construction - 11,300 SF
Design
$2,400,000 est. value
Celina, TX 75009

Guest House on Garrett / 521 Bryan
New Construction, Infrastructure - 39,870 SF
Design
$3,283,000 CJ est. value
Dallas, TX 75201

Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Post-Bid
$460,000 CJ est. value
Dallas, TX 75252

Fuel City Travel Center / Wylie
New Construction, Infrastructure - 9,244 SF
Post-Bid
$4,400,000 CJ est. value
Wylie, TX 75098

Pavement Repairs on City of Dallas Infrastructure at Various Locations Contract No. 10
Term Contract
Results
$25,497,438 est. value
Dallas, TX

Commerce Drive Reconstruction - 15th Street to Plano Parkway Project
Infrastructure
Results
$3,800,000 est. value
Plano, TX 75093

Lake's Little Scholars Montessori
New Construction - 10,600 SF
Construction
$1,900,000 est. value
Frisco, TX 75035

The Learning Experience
New Construction - 10,000 SF
Construction
$2,750,000 est. value
Frisco, TX 75034

Starbucks - Renner & PGBT
New Construction, Infrastructure - 2,063 SF
Pending Verification
$735,140 CJ est. value
Plano, TX 75074

Starbucks - Renner & PGBT
New Construction, Infrastructure - 2,063 SF
Pending Verification
$735,140 CJ est. value
Plano, TX 75074

Mckinney Montessori
New Construction - 12,000 SF
Design
$1,500,000 est. value
McKinney, TX

Frisco ISD McKinney Educational Facility (Craig Ranch) - Bid Package 2
New Construction, Infrastructure - 139,000 SF
Post-Bid
$38,500,000 CJ est. value
McKinney, TX 75070

Excavation Improvements for Inspiration, Phase 8B
Alteration
Results
TX

Popeyes / McKinney
New Construction, Infrastructure - 2,700 SF
Construction
$725,000 CJ est. value
McKinney, TX 75070

Lone Star Medical Center - Building Two
New Construction, Infrastructure - 15,430 SF
Pending Verification
$2,000,000 CJ est. value
Allen, TX 75013

Last Updated 02/22/2023 11:34 AM
Project Title

Children of America Montessori

Physical Address View project details and contacts
City, State (County) McKinney, TX 75070   (Collin County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Pre-School/Daycare, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 22, 2023, this project is pending plan review. Information regarding the architect, general contractor and method of selection has not been disclosed. A timeline for construction has yet to be announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents