Similar Projects
Redevelopment of Seneca Foods Canning Facility - Olmsted County
Demolition, New Construction, Infrastructure
Conception
$7,800,000 CJ est. value
Rochester, MN 55902

Graham Park Multipurpose Expo Building - Olmsted County
Infrastructure
Conception
$12,500,000 CJ est. value
Rochester, MN 55902

City Walk Apartments
New Construction, Infrastructure - 98,398 SF
Design
$50,000,000 CJ est. value
Rochester, MN 55902

City Walk Apartments
New Construction, Infrastructure - 98,398 SF
Design
$50,000,000 CJ est. value
Rochester, MN 55902

Chester Woods Park Amphitheater
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Eyota, MN 55934

2023 Street Improvements
Infrastructure
Bidding
$4,000,000 CJ est. value
Byron, MN 55920

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Site Construction and Control Building
New Construction, Infrastructure
Results
Rochester, MN

Bituminous Mill and Overlay, ADA Improvements and Signal Revisions
Results
MN

41st Street Apartment Building
New Construction, Infrastructure
Pending Verification
$52,100,000 CJ est. value
Rochester, MN 55901

41st Street Apartment Building
New Construction, Infrastructure
Pending Verification
$52,100,000 CJ est. value
Rochester, MN 55901

Highway 14 East Industrial Storage Building
New Construction, Infrastructure - 32,000 SF
Conception
$3,500,000 CJ est. value
Rochester, MN 55904

Destination Medical Center - All Other Phases
New Construction, Infrastructure
Design
$5,600,000,000 CJ est. value
Rochester, MN 55905

West Zumbro Sanitary Sewer Extension to Serve Sanitary Sewer
Infrastructure
Bidding
$443,000 CJ est. value
Rochester, MN 55902

Last Updated 04/04/2023 03:09 AM
Project Title

East Village 4th Turn Lane

Physical Address View project details and contacts
City, State (County) Byron, MN 55920   (Olmsted County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $369,053 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions:Highway 14 to County Road 3 NW, north on County Road 3 NW, and the site is approximately 200 feet north of the Highway 14 and County Road 3 NW intersection. The extent of the work involved is furnishing all labor and materials for construction of the East Village 4th Turn Lane together with related subsidiary and incidental work including: The project consists of: 154 Feet Storm Sewer 1,500 CY Common Excavation 1,284 C.Y. Aggregate Base 657 tons. The Contractor shall commence work after the Notice to Proceed is issued and shall complete all items on or before September 15, 2023. The successful bidder will be required to furnish a Performance and Maintenance Bond and a Payment Bond, both in an amount equal to one hundred (100) percent of the Contract price. Said bonds are to be issued by a responsible surety, approved by the City Council, and which shall guarantee the faithful performance of the Contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor. Said bond shall also guarantee the maintenance of the improvements constructed for a period of two (2) years from and after its completion and acceptance by the City.The apparent low bidder will be required to submit a hard copy of the certified check, cashier's check or bid bond within three (3) days of the bid opening. Bidders shall not be permitted to withdraw their bids for a period of thirty (60) days after the same are opened. Payment for said East Village 4th Turn Lane will be made in cash from cash on hand, from governmental grants, or from such other funds as may be legally used for such purposes. Monthly estimates will be made by the Engineer and payment will be made to the Contractor in the amount of ninety-five (95%) of said estimate. Final payment of money due will be made in cash no later than sixty (60) days after substantial completion. For construction, reconstruction, or improvement of streets and highway, including bridges, "substantial completion" shall be defined as the date when construction-related traffic devices and ongoing inspections are no longer required. The Owner reserves the right to withhold up to two hundred and fifty percent (250%) of the cost to correct deficient work or complete work known at the time of substantial completion. Payment of money due will be made in cash no later than sixty (60) days after completion of the work. The Owner reserves the right to withhold one percent (1%) of the total contract amount or five hundred dollars ($500), whichever is greater, pending completion and submission of all final paperwork by the contractor or subcontractors. "Final paperwork" shall be defined as any documents required to fulfill contractual obligations, including, but not limited to, operation manuals, payroll documents for projects subject to prevailing wage requirements, material certifications and warranties, DBE final clearance, NPDES Permit Termination, withholding exemption certificate, etc. Payment of money due will be made in cash no later than sixty (60) days after submission of all final paperwork. The City Council reserves the right to reject any and all bids and to waive technicalities and irregularities. Published upon order of the City Council of the Byron, Minnesota. Al Roder City Administrator City of Byron, Minnesota

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents