Similar Projects
Paradise Honors Classroom Building
New Construction
Post-Bid
Surprise, AZ 85388

Tempe Academy Campus Rebuild - GMP2
New Construction, Renovation, Demolition - 55,451 SF
Post-Bid
$10,500,000 est. value
Tempe, AZ 85282

Weatherization Project at Highland High School
Results
Less than $441,604 est. value
Gilbert, AZ 85296

Build a New High School #7
New Construction
Results
Less than $22,124,889 est. value
Chandler, AZ

Restroom Renovations at North High School
Renovation
Construction
Less than $1,085,889 est. value
Phoenix, AZ 85014

Greenhouse Montessori - Classroom Building
New Construction - 3,870 SF
Construction
$500,000 est. value
Gilbert, AZ 85296

NCHS Performing Art Center Renovations and Improvements
Renovation
Post-Bid
$8,000,000 est. value
Phoenix, AZ 85024

Job Order Contracting for General Contractors
Results
AZ

CM at Risk Construction Management for Sunnyslope Campus Renovations
Renovation
Construction
Phoenix, AZ 85021

CMAR Gililland Middle School
Renovation
Post-Bid
$38,000,000 est. value
Tempe, AZ 85281

A New High School
New Construction
Results
$22,500,000 est. value
Maricopa, AZ 85138

Demo Media Center and New Performing Arts Center, New Media Center, 500 Building Demo and Rebuild
Renovation, Demolition
Post-Bid
$36,500,000 est. value
Tolleson, AZ 85353

Classroom Building Additions at Tonopah Valley High School
Addition - 15,000 SF
Results
$4,800,000 est. value
Tonopah, AZ 85354

Southwest Human Development : Final Clean
Renovation
Post-Bid
Phoenix, AZ 85008

Millennium HS Gymnasium and Campus Renovations
Renovation
Results
Goodyear, AZ 85395

Last Updated 05/20/2021 04:45 PM
Project Title

Mountain View Elevator Modernization

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85213   (Maricopa County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Elevator Modernization at Mountain View High School for Mesa Public Schools. The bid shall include labor, material, equipment, services and transportation necessary for modernization of the elevator projects. Project Location: Mountain View High School, 2700 E. Brown Road, Mesa, AZ 85213 Project: Elevator Modernization at Mountain View High School Base Bid – Mechanical: Provide new mini-split A/C unit to cool the Elevator Equipment Room. Provide refrigerant piping between the wall mounted indoor unit and the ground mounted outdoor condensing unit. Provide concrete housekeeping pad for the outdoor unit to sit on along with a cage to cover/protect the outdoor unit.Remove the existing window A/C unit, controls, thermostat, and all associated wiring/conduit from the Telephone Room located directly above the Elevator Equipment Room. Patch opening in stucco’ ed masonry wall to match existing. Electrical: Disconnect and remove existing electrical equipment, light fixtures and devices in the existing elevator machine room, including existing elevator power feed. Provide new power connections to the new elevator equipment, A/C units, new light fixtures, receptacles and disconnect switches. Provide design and installation for the new fire alarm system as pertains to the elevator and the elevator machine room. Architectural: Provide a new 8’-0” tall 1-hour rated wall, ceiling, and door to enclose the new Elevator Equipment Room. Texture, finish, and paint to match existing. Elevator Equipment Contractor: Remove existing elevator equipment, piping, and controls from the existing Elevator Equipment Room. Provide and Install new Microprocessor based controls, new Landing System, and new Submersible pump unit. Provide and install new Car, machine room, and hoistway wiring. Provide and install new Car closed-loop door operator and all related hardware. Provide and install new Car, hall fixture to meet current A.D.A. Federal guidelines, and all Cab interior upgrades as approved by School District.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents